BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work, paving and new construction of a bridge / tunnel in Firestone, Colorado. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000397443 Scope of Work: The awarded Consultant shall provide applicable services consisting of, but not limited to, the following: The Town of Firestone intends to design and construct a new pedestrian bridge over the St. Vrain Creek to improve the non-motorized connectivity, enhance the public safety, and expand access to the Town's trail and transportation network. The bridge will provide an important link between the neighborhood, parks, and regional trail corridors, supporting the Town's long-term vision for mobility and recreation. In 2024, SEH completed a feasibility study evaluating alternative crossing locations for the pedestrian bridge. The study analyzed potential sites based on constructability, environmental impacts, cost, and long-term maintenance considerations. The study's findings and the recommended crossing location are provided in Exhibit B. The selected consultant will advance the project based on the feasibility study recommendations and through coordination with the Town. The project is anticipated to include all tasks necessary to advance the preferred alternative through design and construction, including project management, site investigation and data collection, environmental assessment, Rightof- way evaluation, preliminary and final design, permitting and agency coordination, bid phase guidance, and construction phase services. The Town's goal is to deliver a safe, durable, and context-sensitive pedestrian crossing that minimizes environmental impacts, meets regulatory requirements, and provides long-term value to the community. A summary of the work for which the Proposal is requested consists of: The Town of Firestone wants to construct a pedestrian bridge over the St. Vrain Creek in Firestone, CO. The selected engineer will provide planning, design, permitting, and bid-phase services necessary to deliver a complete set of construction documents suitable for competitive bidding and construction. October 2025 Board Approval of Contract October 2025 Notice of Intent to Award Proposals received after the date and time indicated and/or proposals that are not prepared and filed in accordance with the terms and conditions of the Request for Proposal will not be considered for evaluation. Question Deadline 09/12/2025 at 12:00 PM MT Questions are submitted online No, Project Manager Information: Questions related to this Proposal should be emailed to Kiran Bhusal, PE, at kbhusal@firestoneco.gov All answers to questions received will be sent in a formal addendum (if needed) by September 15, 2025.

Conceptual

Bridges / Tunnels

$400,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
57
Bidding Soon
1,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

Project location map

St Vrain Rd, Firestone, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.