Published April 23, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Sayreville, New Jersey. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and water / sewer project.

The project generally consists of upgrading the existing Jerry Ust Recreational Complex located on Bordentown Avenue. The work involved with these improvements includes the furnishing and installation of two (2) drainage system network and aggregate base construction improvements including reinforced concrete edge curbing and all appurtenances, that are necessary for the placement of two (2) new Synthetic Turf systems to be installed by Others under a separate Contract. Athletic Field Sports Lighting will also be installed at the upgraded athletic fields by Others under a separate Contract and during the construction of this project. The work involved with these improvements includes paved access road extension and new parking lot area; maintenance and protection of vehicular / pedestrian traffic; all safety procedures / provisions, coordination / scheduling of all work; site clearing and site grading operations; cutting and removal of existing trees; construction of variable height modular block type retaining walls including design calculations and certifications; completely operational access road / parking lot lighting systems with all electrical appurtenances; coordination with JCP&L including necessary trench excavation / backfill, installation of PVC conduit, pullbox structure, reinforced concrete transformer pad and all other associated JCP&L work; coordination with Williams Gas Company including test pit excavations and compliance with all requirements / procedures; installation of approximately 2,650 lineal feet ± of 12” diameter perforated HDPE collector pipe / underdrain; installation of approximately 1,435 lineal feet ± of various sizes of RCP Class IV and V of storm sewer pipe reaches; construction of various types of storm sewer structures; rip-rap lined conduit outlet protection area; construction of approximately 2,400 cubic yards ± of underground detention basin facility including 36” diameter perforated HDPE pipe reaches, various types of drainage structures, clean crushed stone encasement, geotextile filter fabric and all appurtenances; installation of approximately 600 lineal feet ± of 8” DIP water main; resetting of existing water main / hydrant valve boxes; removal and replacement of existing deteriorated sanitary sewer manhole frames / covers; construction of approximately 1,200 square feet ± of 6” thick reinforced concrete slabs; construction of approximately 8,000 square yards ± of HMA meandering walkways, milling existing pavement; installation of approximately 2,000 cubic yards ± of dense graded aggregate base course material; installation of approximately 3,000 tons ± of HMA base course material and approximately 1,500 tons ± of HMA surface course material; parking area improvements including signage, bumper blocks and application of approximately 6,500 lineal feet ± of pavement stripes / markings (4” wide lines); furnishing and installation of approximately 2,100 lineal feet ± of timber guide rail and all appurtenances; timber post / rail type fence; installation of approximately 2,800 lineal feet ± of various height vinyl coated chain link fence and various height / width of vinyl coated chain link fence gates; one (1) galvanized steel chain link backstop, furnishing and installation of two (2) non-elevated bleachers; aluminum / galvanized steel benches, site landscaping including 24” thick topsoil and 4” thick hardwood mulch; furnishing and installation of approximately 33,500 square yards ± of 5” thick topsoil, seed and mulch and/or soil stabilization matting, where applicable; final clean-up; and all other associated site improvements, preparation, restoration and necessary work in accordance with the Contract Documents. Each Bid must be accompanied by a certified check or cash in the amount of not less than ten (10%) percent of the Bid, but not more than $20,000.00 payable without any conditional endorsement as a guarantee that in case the Contract is awarded to the Bidder, he will within ten (10) days thereafter execute such contract and furnish satisfactorily performance bonds. Upon failure to do so he shall forfeit the deposit as liquidated damages and the acceptance of the Bid will be contingent upon the fulfillment of this requirement by the Bidder. No interest shall be allowed upon any such certified check or cash. A bid bond in the amount of ten (10%) percent of the Bid, but not more than $20,000.00, may be substituted for certified check or cash. Each Bid must also be accompanied by a certificate of Consent of Surety from a Bonding Company licensed to do business in the State of New Jersey and named in the current list of "Surety Companies Acceptable on Federal Bond", U.S. Treasury Department, guaranteeing that if the proposal of the Bidder be accepted they will furnish the bond set forth in Articles 2 and 5 of the General Conditions Section F of the Contract and the acceptance of the Bid will be contingent upon the fulfillment of this requirement. The Borough reserves the right to increase or decrease quantities specified in the manner designated in the Specifications. The Borough reserves the right to award this Contract based on funds available. All bidders are required to be registered with the New Jersey Department of Labor if they elect to bid public work projects.

GC Bidding

Roads / Highways

$375,000.00

Public - City

Outdoor Lighting, Paving, Site Work

49

23

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Flags
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Athletic Field Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating, Pews and Benches, Benches
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Engine Generators, Lighting, Special Purpose Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Mowing, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Molds, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
296
Bidding Soon
5,238
All Active Projects
2,161
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 13, 2025

img_map_placeholder

Bordentown Ave, Sayreville, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Improvements to Jerry UST Recreational Complex

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.