Renovation of a transportation facility in Horseheads, New York. Completed plans call for the renovation of a transportation facility.
Reference Number 0000383135 The work of this project is separated into a number of Bid Packages, of which Package "General Trades" is the portion of work belonging to this Contractor. The Contractor will provide a final lump sum cost proposal for the "General Trades" that will include the work defined herein. a. GENERAL TRADES 1) Provide the necessary materials, labor, equipment, and supervision to perform the "General Trades" work as indicated in the Division of Work of this Section. 2) Provide and utilize the necessary equipment to perform the work in a safe and expeditious manner. b. Perform the work under lump sum contract with Chemung County, Owner. Furnish all labor, materials, tools, equipment, supervision, layout, delivery, trucking, shop drawings, submittals, as-built drawings, etc. necessary to complete the work described in Division of Work for this Contract, whether specified above or not. 2. The following requirements apply to all bid items. these must be included in bidding any or all of the bid items. a. All existing conditions must be verified in the field. The Owner takes no responsibility for actual conditions found deviating from the drawings. If existing condition interferes with Contract Work, Contractor is responsible to eliminate the condition DIVISION OF WORK 1. Furnish and install all labor, material, supervision, engineering, administration, project management, equipment, layout, deliveries, trucking, hoisting, supplies, mock-ups, rigging, shop drawings, submittals, and all other items related and required to complete all Work in accordance with the Contract Documents and all applicable codes, laws, and regulations having jurisdiction. 2. The Contractor represents they have expertise in the performance of work for this trade and assure all systems to be complete, functional, and installed in accordance with the best practices consistent with premium quality material and workmanship. The Scope of Work includes, but is not limited to the following: a. All work shown and described in the following drawing Series: "CS", "CN", and "A", of the drawing set entitled "Elmira Corning Regional Snow Removal Equipment (SRE) BuildiRoof Replacement" b. All work required and described in the following Specification Sections: 1) Volume 1 in its entirety [(Bidding Requirements, Proposal, Contract Forms, FAA General Provisions and Forms, FAA Supplemental General Provisions (SGP), and Division 01 General Requirements (all Specifications)]. 2) All Site/Civil Specifications sections starting with "C", "M", and "S". 3) Division 7 - Thermal and Moisture Protection in its entirety. c. The work associated with this contract involves working in the airport, which will remain operational during the project. Extreme care must be taken so that the existing airport operations are not impacted. Any work that may affect the current facility operations will need to be scheduled and approved prior to commencing work d. Extreme care is to be taken to avoid any unplanned interruptions to the existing facilites operations. Any work to be performed that may impact the operations of the facility will be done on a planned basis utilizing off-shift and weekend hours at the\ cost of Contractor. e. All equipment and materials, fuel, oil, and repairs for equipment utilized in this scope of work. f. Provided daily clean-up of work, staging areas, and private and public roads. Place debris in containers provided by Contractor. Any hazardous debris shall be handled in strict accordance with all laws and regulations by Contractor. g. Contractor is responsible for all scaffolding, fall protection, hoisting, and any other labor, materials, or equipment necessary to complete this scope of work. h. All labor and material to provide weather protection required to perform the work and protect the finished work within this scope. i. Maintenance of all staging areas as it pertains to this scope of work. j. Contractor must comply with all Airport and Contractor's own site specific safety policies. k. Contractor is responsible for all permits/inspections required to perform this scope of work. l. Contractor is responsible for all items related to the scheduling, coordination, safety, submission of a lift plan, and planning of crane operations to complete all contract work for this project. m. Contractor is responsible for cleanup, removal, and cost of any hazardous materials, oil contaminated materials, spills, or leaks. n. Contractor must protect their own work as well as the work of others when performing this scope of work. o. Contractor will be required to correct all defective work as directed. p. Contractor is responsible for adhering to all OSHA requirments for personal and job site safety pertaining to their specific scope of work. q. Contractor will provide all necessary trash removal for the site. r. Contractor will be required to submit a sequence and logistics plan for any activities and locations that may affect visibility of the existing apron, taxiways, runways, etc. for review and approval by the Airport and the FAA prior to the start of work. s. The work in this contract is not limited to any particular drawings. All drawings should be reviewed to determine the scope of this contract. Question Deadline 04/28/2025 at 12:00 PM ET Questions are submitted online No .Questions pertaining to the technical specifications of this project shall be directed to: Devin A. Shapley, P.E. and Chris Zarrelli McFarland Johnson, Inc. 49 Court St, Suite 240 Binghamton, NY 13901 Ph: 607-723-9421 Email: dshapley@mjinc.com and czarrelli@mjinc.com General Requirements - Bid Deposit Required - Insurance Required - License Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % Each bid shall be accompanied by a deposit in the amount of Five Percent (5%) of the total base bid in the form of a Certified Check, Bank Draft, or Bid Bond. Cash will not be acceptable as a deposit. Goals for minority participation for each trade: 6.58% (last published May 24, 2023) Goals for female participation in each trade: 6.9% DBE (4.5%) Estimated Start Date: May 2026 Estimated Completion Date: June 2026
Award
Transportation Terminals
$295,139.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
May 5, 2026
276 Sing Sing Rd, Horseheads, NY
Related To This Project
Horseheads, NY
Bid Date: Apr 21 2025
Horseheads, NY
Bid Date: May 01 2025
Horseheads, NY
Bid Date: May 15 2025
Horseheads, NY
Bid Date: Jun 05 2025
Horseheads, NY
Bid Date: Jun 06 2025
Horseheads, NY
Bid Date: Jun 20 2025
Horseheads, NY
--
Horseheads, NY
Bid Date: Jul 11 2025
Horseheads, NY
Bid Date: Apr 15 2025
Horseheads, NY
Bid Date: Mar 19 2025
Horseheads, NY
Bid Date: Mar 14 2025
Horseheads, NY
Bid Date: Mar 14 2025
Horseheads, NY
Bid Date: Mar 14 2025
Horseheads, NY
Bid Date: Mar 14 2025
Horseheads, NY
Bid Date: Mar 14 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.