Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 17, 2025 at 8:00 PM
Updated April 18, 2025
This is a service / maintenance or supply contract in Topeka, Kansas. Contact the soliciting agency for additional information.
The City of Topeka is requesting proposals for professional engineering services to provide engineering design and construction documents for a sidewalk and shared use path and a traffic safety study from SW 45th St. to SW Gage Blvd to SW Cambridge Ave. The City of Topeka is requesting proposals for professional engineering services for Project No. 701070.00, "SW 45th St. - SW Gage Blvd to SW Cambridge Ave.". The services include providing engineering design and construction documents for a sidewalk/shared-use path and a traffic/safety study. The traffic/safety study shall be along SW 45th from Gage Blvd to Cambridge Avenue. The traffic study is to be limited to determining if a turning lane is warranted and identifying locations of pedestrian crossings and determining if additional cross walk features are warranted. The engineering design of the sidewalk/shared-use path shall match any proposed road geometry changes determined from the study. The intent is to reconstruct the road at a future date (if necessary) without having to remove and replace the sidewalk. Background Information The Functional Classification of SW 45th from Gage to Cambridge is an arterial. The 2024 AADT according to Replica is between 600-850 vpd each direction, depending on which section of SW 45th Street. This stretch of SW 45th crosses over a drainage structure to Colley Creek. This drainage structure may need to be extended for placement of the sidewalk/shared-use path. Additionally, Berkshire Country Club has many Golfers who cross 45th from the Club House to the Front Nine Holes. There has been a couple developments proposed for the area. One development being the Ardmore Walk Addition Subdivision. The development has been on the west side of Gage, just north of 45th, and is proposed to be a high-end retirement community. The existing road has an average PCI of 91. Additional information can be found on page 80 of the 2026-2035 Proposed CIP. The proposed project schedule includes survey and design of both 45th Street & the proposed sidewalk/shared-use path (Engineered Plans for Sidewalk/shared-use path only) and the traffic/safety study, beginning in 2025; utility relocation and right-of-way acquisition, if necessary, to occur in 2025 as well; and construction of the sidewalk to occur in 2026. Deliverables 1. 30% complete with an EPCC by August 1st, 2025 2. 60% complete with an updated EPCC by October 1st, 2025 3. First Public Meeting - Late October 2025 4. 90% complete with an updated EPCC by December 19th 5. Final project drawings, project manual, and cost estimates, will be completed by February 1st, 2026. Question Deadline 05/09/2025 at 3:30 AM CT The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2025
Multiple Locations, Topeka, KS
Related To This Project
Topeka, KS
Bid Date: Jul 15 2025
Topeka, KS
Bid Date: May 08 2025
Parking Lot Pavement Sealcoating, Curb Replacement and Stripping Shawnee County Courthouse - 5760281
Topeka, KS
Bid Date: May 02 2025
Topeka, KS
Bid Date: May 01 2025
Topeka, KS
Bid Date: May 01 2025
Topeka, KS
Bid Date: May 15 2025
Topeka, KS
Bid Date: May 21 2025
Topeka, KS
Bid Date: May 14 2025
Topeka, KS
Bid Date: May 07 2025
Topeka, KS
Bid Date: May 02 2025
Topeka, KS
Bid Date: Apr 16 2025
Topeka, KS
Bid Date: May 07 2025
Topeka, KS
Bid Date: Apr 15 2025
Topeka, KS
Bid Date: Apr 30 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
