BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Site work for a mixed-use development in Clear Lake, Iowa. Completed plans call for site work for a transportation facility; and water / sewer project.

The work generally consists of landscaping installation near the New Airport Terminal building. Base Bid work generally includes soils preparation, planting installation, backfill, and installation of mulch and rock planting beds. Bid Alternate 1 work includes design and installation of an automated irrigation system. Question Deadline 05/06/2025 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, or through mail. Contact individual shall be as follows: Ryan Turner, PE Foth Infrastructure & Environment, LLC 8191 Birchwood Court, Suite L Johnston, Iowa 50131 (515) 664-7576 ryan.turner@foth.com After issuance of Notice to Proceed, contractor may commence work on the project. The Mason City Municipal Airport has established a construction completion date of October 15, 2025. All project work shall be completed within the stated timeframe and per the additional planting periods indicated in the project plans. This project is subject to liquidated damages as prescribed within the project manual. Bid security in the amount of Five percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful bidder shall be required to provide performance and payment Bonds, each in the amount of 100 percent of the Contract Price. A pre-bid conference has not been established for this project. The right is reserved, as the Airport Commission may require, to reject any and all bids and to waive any informality in the bids received. Engineer's estimate of probable construction cost is between $180,000 and $230,000, including Bid Alternate 1. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$164,185.00

Public - City

Site Work

9

8

9

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
59
Bidding Soon
641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2025

June 11, 2025

Project location map

9184 265th St, Clear Lake, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.