BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and paving for a mixed-use development in Clear Lake, Iowa. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Description of Work Work Area 1 includes asphalt pavement taxilane, grading, modified subbase, storm, sanitary, and water utility installation. Work Area 2 primarily consists of constructing a water meter and backflow preventer building, including site embankment, water main, fittings, and other appurtenances. The Engineer's estimate of probable construction cost is between $755,000 and $835,000. General project scope items: o 600 ft of water main o 650 ft of storm sewer o 400 ft of sanitary sewer o 1,200 CY Class 10 excavation and embankment o 1,600 SY subgrade, geotextile, and modified subbase o 420 tons hot mix asphalt o Water meter and backflow preventer building o Erosion control o 4 acres seeding, fertilizing, mulching Contract Time Information After issuance of Notice to Proceed, contractor may commence work on the project. The Mason City Municipal Airport has established a construction completion date of October 17, 2025 for Work Area 1, and a construction completion date of May 22, 2026 for Work Area 2. All project work shall be completed within the stated timeframe. This project is subject to liquidated damages as prescribed within the project manual. Bid security in the amount of Five percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful bidder shall be required to provide performance and payment Bonds, each in the amount of 100 percent of the Contract Price. Question Deadline 06/03/2025 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing, or through mail. Contact individual shall be as follows: Ryan Turner, PE Foth Infrastructure & Environment, LLC 8191 Birchwood Court, Suite L Johnston, Iowa 50131 (515) 664-7576 ryan.turner@foth.com Award of Contract All proposals submitted in accordance with the instructions presented herein will be subject to evaluation. Bids may be held by the Airport Commission for a period not to exceed 30 days from the date of the bid opening for the purpose of conducting the bid evaluation. It is the intent of the Airport Commission, after a period of review and evaluation, to award the contract to the responsible bidder that submits the lowest responsive proposal, meeting the requirements of the technical specifications and supplemental Owner specific additions and clarifications. The right is reserved, as the Airport Commission may require, to reject any and all bids and to waive any informality in the bids received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Transportation Terminals

$811,365.00

Public - City

Paving, Site Work

35

18

10

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
59
Bidding Soon
641
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

July 9, 2025

Project location map

9184 265th St, Clear Lake, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.