Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work and paving for a civil project in Beaufort, South Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Beaufort County is seeking bids from SCDOT pre-qualified contractors to construct 0.36 miles of 10 ft concrete shared-use path on Depot Road between the Spanish Moss Trail and Ribaut Road. The project will involve clearing and grubbing, grading, drainage, pavement markings, signs, sediment and erosion control, traffic control, and other miscellaneous items. All questions must be submitted through the Procurement Portal no later than 5:00 pm on Tuesday, May 6, 2025. All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract amount. A copy of the Bid Bond or Certified Check must be electronically sent with your bid documents through the Procurement Portal, as indicated in the Vendor Questionnaire Section. The original Bid Bond or Certified Check must be received by the Procurement Services Department within 10 days after the bid due date. Failure on the bidder's part to provide a copy of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive bid and rejected by the County. The Bid Bond shall be forfeited to the County Council of Beaufort County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within fourteen (14) days after being notified that he has been awarded the Contract. The Disadvantaged Business Enterprises (DBE) Goal for the project is 9% of the Contract Amount. Contractor shall complete all work within 120 calendar days from Notice to Proceed. Contractor shall complete all punchlist work within 45 calendar days from the date of Final Inspection. Liquidated Damages shall comply with SCDOT 2025 Standard Specifications for Highway Construction Section 108.9

Bid Results

Roads / Highways

$502,301.00

Public - County

Paving, Site Work

43

7

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
38
Bidding Soon
826
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

June 16, 2025

Project location map

Depot Rd, Beaufort, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.