Published May 27, 2025 at 8:00 PM
Updated May 29, 2025
Site work and paving for a road / highway in Jeffersonville, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
** As of May 27 2025, project was awarded to MAC Construction & Excavating, Inc., awarded amount is $541,265 ** The project includes milling, resurfacing, patching and base repair of asphalt, pavement markings, and all other necessary items to result in a complete project. Project Description Division A Starting at the intersection of Perry Crossing Road and SR-60 extending northward along Perry Crossing Road to the existing Sellersburg Town Limits approximately 0.36 miles. Contractor shall mill and remove 2-inches of existing asphalt pavement, repair/patch approximately 40% of existing base material, proof roll base and install 1.5-inches of asphalt surface over entire project. After surface HMA is installed a liquid sealer (RejuvTec) shall be applied and striping will be installed. Division B Starting 500 feet west of the intersection of Greenleaf Road and CR-403 (25+ feet east of the existing Railroad tracks), and extending eastward along CR-403 to the west end of the Bridge over Silver Creek, approximately 0.89 miles. Contractor shall mill and remove 2-inches of existing asphalt pavement, repair/patch approximately 30% of exposed base material, proof roll base and install 1.5 inches of asphalt surface. After surface HMA is installed a liquid sealer (RejuvTec) shall be applied and striping will be installed. The bidder must file with their sealed bid proposal, a certified check or a bid bond in the amount of Five (5) percent of the amount of the proposal, payable to Clark County Board of Commissioners. The above checks or bonds are to ensure the executive of the contract on-which such bids are made The Contractor to whom the work is awarded will be required to furnish, before commencing work, a performance and maintenance bond to extend for a period of one year after final acceptance, in an amount equal to the bid price of the contract awarded to said Contractor and Certificate of Insurance as described in the Contract Documents. As a requirement of the Community Crossings Grant funding utilized for this project, the prime contractor to whom the work is awarded must be prequalified with INDOT. Subcontractors can enter into subcontracts up to $300,000 without being prequalified with INDOT, however, the subcontractor is limited to a total of $300,000 in unearned work under contact on any given date with any owner, contractor, or other party. The CONTRACTOR will commence the work required by the CONTRACT DOCUMENTS within 10 calendar days after the date ofthe NOTICE TO PROCEED and shall be complete by August 15,2025 unlessthe period for completion is extended otherwise by the CONTRACT DOCUMENTS. Project Description Division A Starting at the intersection ofPerryCrossingRoad and SR-60 extending northward along Perry Crossing Road to the SdlosburgTownlimits approximately 0.36 miles. Contractorshall mill and remove 2- inches ofexisting asphalt pavement, repair/patch approximately 40%ofexisting base material, proofroll base and install 1,5-inches ofasphalt surface for entireproject. After asphalt surface is installed, Contractor shall apply a liquid asphalt sealer (RejuvTec) to the entire project and apply centerline and edge ofpaving striping. Division B Starting 500 feet west ofthe intersection ofCR-403 and GreenleafRoad (approximately 25 feet west ofthe existing railroad tracks), then extending north eastward along CR-403 approximately 0.89 miles to the west edge ofthe existing bridge over Silver Creek. Contractor shall mill and remove 2-inches of existing asphalt pavement, repair/patch approximately 30% ofthe existing exposed base material, proofroll the base and install 1,5-inches of asphalt surface for the entire project. After asphalt surface is installed. All milling materials removed from site shall be delivered to County Garage, located at 6103 CR-403. Contractor shall apply a liquid asphalt sealer (RejuvTec) to the entire project and apply centerline and edge ofpaving striping.
Award
Roads / Highways
$541,265.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 24, 2025
May 26, 2025
Multiple Locations, Jeffersonville, IN
Related To This Project
Jeffersonville, IN
Bid Date: Jul 08 2025
Jeffersonville, IN
Bid Date: May 16 2025
Jeffersonville, IN
Bid Date: Jun 10 2025
Jeffersonville, IN
Bid Date: Jul 01 2025
Jeffersonville, IN
Bid Date: Jul 15 2025
Jeffersonville, IN
Bid Date: Jul 31 2025
Jeffersonville, IN
Bid Date: Aug 13 2025
Jeffersonville, IN
Bid Date: Aug 25 2025
Jeffersonville, IN
Bid Date: May 01 2025
Jeffersonville, IN
Bid Date: Apr 09 2025
Jeffersonville, IN
--
Jeffersonville, IN
Bid Date: Apr 10 2025
Jeffersonville, IN
Bid Date: Jul 09 2025
Jeffersonville, IN
Bid Date: Mar 05 2025
Provide HVAC Services and/or Air Sealing and Insulation Services to Residential Properties - 5682757
Jeffersonville, IN
Bid Date: Feb 21 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.