BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 30, 2025 at 8:00 PM

Updated October 1, 2025

Renovation of a library in Schiller Park, Illinois. Completed plans call for the renovation of a library.

Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond,Certified Check or Bank Draft in an amount equal to and not less than ten percent(10%) of the bid and made payable to Schiller Park Public Library. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Owner. Checks or drafts of unsuccessful Bidders will be returned as soon as practical, after opening and checking the bids. Successful Bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. Bids shall be submitted in an opaque sealed envelope clearly marked as SEALED BID and addressed to:Kendall Santucci Director4200 Old River Rd,Schiller Park, IL 60176 The Board of Trustees reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities in bidding, that are in the opinion of the Owner,to be in the best interest of the Schiller Park Public Library.This Contract is subject to the Illinois Prevailing Wage Act (820 ILCS 130/1 et seq.). The Qualification Documents will be reviewed by the Owner and Architect to determine the lowest responsible Bidder. PROJECT DESCRIPTION A. The Project consists of mechanical control upgrades, asbestos abatement in multiple small areas, drywall patching, partial removal and replacement of ceilings systems on the library's main and lower levels with electrical work that accompanies the mechanical control scope. The project is for the Schiller Park Public Library, hereafter called the Owner, and is to be constructed in accordance with the Contract Documents prepared by Studio GC, dated April 10, 2025. B. Scope: The Work includes the work of all trades required; and all the labor, materials, and equipment necessary and incidental to the construction and completion of the Work. C. Work to be executed under one General Contract, including all trades. Tentative Date of Board Approval of Bids: July 24, 2025 B. Commencement of Work: September 15, 2025 1. Contractor has option to commence work on site on August 18, 2025. C Substantial Completion: November 10, 2025 1. Substantial Completion would be October 13, 2025 if Contactor begins on August 18, 2025. D Final Completion: December 1, 2025 1 Final Completion would be November 3, 2025 if Contactor begins on August 18, 2025.

Award

Library

$269,723.00

Public - City

Renovation

19

13

10

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
481
Active Projects
263
Bidding Soon
3,494
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 18, 2025

Project location map

4200 Old River Rd, Schiller Park, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.