Site work, outdoor lighting and renovation of a water / sewer project in Malone, New York. Completed plans call for the renovation of a water / sewer project; for site work for a water / sewer project; and for outdoor lighting for a water / sewer project.
Electrical (E) - The contract includes power components and connections, emergency generator, site electrical, site and building lighting, removal of existing SCADA control/VFD panel and installation and termination of Owner-furnished SCADA control/VFD panel and associated startup & support, providing power and control conduit and terminations for new equipment, instrumentation, and SCADA control panel at Control (CNT) Building. Electrical: $ 350,000.00 Milestone Dates: o Commence Construction: July 7, 2025 o The Work will be substantially completed by November 30, 2026, and completed and ready for final payment by December 31, 2026, and in accordance with Paragraph 15.06 of the General Conditions Contract questions and answer period. o Utilize the Request for Clarification (RFC) Form in the specifications manual and all questions should be received by 12:00 pm April 24 th , 2025. Make sure to send questions to Ryan Oliver (ryanoliver@aesnortheast.com) The successful bidder(s) will be required to provide Performance and Payment Bonds each in an amount equal to 100% of the contract value. This project is being funded through NYS Environmental Facilities Corporation. All contractors must comply with funding agency requirements set forth in the Contract Documents. M/WBE Requirements: a. The contract does require Contractors to utilize Minority and Women Business Enterprises (M/WBE) and Disadvantaged Business Enterprise Program (DBE). It is the policy of the Owner and Funding Agency to encourage disadvantaged business enterprises, including minority, veteran and women business participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The MWBE goals for this Contract are 20%. "MWBE Participation In accordance with Section 316-a of Article 15-A and 5 NYCRR 142.13, if it has been determined by the Recipient or EFC that the Contractor has willfully and intentionally failed to comply with the MWBE participation goals, the Contractor shall be obligated to pay to Recipient liquidated damages or other appropriate damages, as specified herein and as determined by the Recipient or EFC." b. The MWBE Utilization Plan and Waiver Request, if applicable, are required to be submitted within 10 days of notification of low bid. It is recommended however, that the Contractor submit within 5 days of notification of low bid, to allow time for review/comment by the MBO, and for any potential revisions to be made. Due to this, contractors are highly encouraged to work on MWBE requirements while bidding. In order for the Engineer and Village of Malone to review bids immediately, any bidder who has not worked with the Village or AES Northeast previously, should submit a Statement of Contractor Qualifications with their Bid. 16. The successful Contractor will be required to pay liquidated damages in the amount of $1,000 per each calendar day that expires after the contract milestone or completion dates specified by the Notice to Proceed. 17. This is a prevailing wage rate project and funded in part with funds provided by NYS Environmental Facilities Corporation (EFC); therefore, both NYS Prevailing Wage Rates and Davis Bacon Wage Rates are included in the Appendices of the Project Manual. Contractors are required to pay subcontractors and workers the higher of the two rates for the particular classification. It is the Contractors responsibility to ensure they are utilizing the most current rates. 18. Reporting Requirements: Contractor is responsible for any all reporting requirements associated with this project. Thisincludes but is not limited to Certified Payroll, Monthly and Quarterly MWBE Reports and EEO Reports. 19. Discussion was had regarding Smartsheet and its role in the project. 20. Contractor's costs for products, delivery, installation, labor, insurance, payroll, taxes, bonding, equipment rental, will be included in Change Orders and/or Change Directives authorizing expenditure of funds from these Allowances.
Award
Water / Sewer
$331,000.00
Public - City
Outdoor Lighting, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
July 7, 2025
Multiple Locations, Malone, NY
Related To This Project
Malone, NY
Bid Date: May 08 2025
Malone, NY
Bid Date: May 08 2025
Malone, NY
Bid Date: Jul 29 2025
Malone, NY
--
Malone, NY
Bid Date: May 14 2025
Malone, NY
Bid Date: Jul 02 2025
Malone, NY
Bid Date: Aug 18 2025
Malone, NY
Bid Date: Sep 10 2025
Malone, NY
Bid Date: Jul 29 2025
Malone, NY
Bid Date: Apr 24 2025
Malone, NY
Bid Date: Apr 23 2025
Malone, NY
Bid Date: Apr 07 2025
Malone, NY
--
Malone, NY
Bid Date: Mar 31 2025
Malone, NY
Bid Date: Mar 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.