BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Site work and renovation of a civil project in Lumberton, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

generally described as construction of a new 6.0 MGD ADF enhanced biological removal wastewater treatment which will consist of the construction of two (2) oxidation ditch type aeration units rated for 3.0 MGD each, an elevated influentsplitter box, two (2) 130-ftrapid sludge removal clarifiers, a RAS/WAS/Scum liftstation, tertiary filters, chlorine contact chamber, flowmeasurement, discharge outfall, aerobic digestor, sludge dewatering system, secondary electrical building, chemical building, chemical feed systems, nonpotable watersystem, electrical and controls, and two (2)standby generators. This project will also provide for the expansion of the primary electrical building, modifications to the existing headworks structure, influent junction box, and primary electrical building. Additive alternative itemssuch as grit removal, alum dosing for enhanced phosphorusremoval, demolition, and miscellaneousimprovements are also included. The right is reserved by the LMUD, as its interest may require, to accept or reject any or all bids, and to waive any informality not involving price, time, or changes in the work in the bids received. Question Deadline 06/05/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Questions received less than five days prior to the date for opening of Bids may not be answered. Bid Security, only in the form of: 1) a certified or cashier's check drawn on a Texas bank and made payable to the LMUD; or 2) a bond executed by a surety company authorized to do businessin Texas, in the amount of not lessthan five (5%) percent of the total bid, must accompany each bid at the time it issubmitted. Bids must be submitted in duplicate. Bids may not be submitted electronically. Bids may be held by the LMUD for a period not to exceed 90 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and/or Section 608 of the Federal Water Pollution Control Act. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Affirmative Action Requirement - Contracts awarded under this Invitation to Bids is expected to follow 40 CRF Part 7 regarding no discrimination on the basis of race, color, national origin, or sex. Davis-Bacon prevailing wage requirements apply to the construction, alteration, or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund Program (CWSRF). Upon award, the successful bidder will be required to furnish payment and performance bonds. Contracts awarded under this Invitation for Bids is expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees are or will be party to this bid. Bid award is contingent upon Texas Water Development Board approval. If the General Conditions or Supplemental Conditions conflict with the TWDB General and Supplemental Conditions, the TWDB General and Supplemental Conditions shall supersede.generally described as construction of a new 6.0 MGD ADF enhanced biological removal wastewater treatment which will consist of the construction of two (2) oxidation ditch type aeration units rated for 3.0 MGD each, an elevated influentsplitter box, two (2) 130-ftrapid sludge removal clarifiers, a RAS/WAS/Scum liftstation, tertiary filters, chlorine contact chamber, flowmeasurement, discharge outfall, aerobic digestor, sludge dewatering system, secondary electrical building, chemical building, chemical feed systems, nonpotable watersystem, electrical and controls, and two (2)standby generators. This project will also provide for the expansion of the primary electrical building, modifications to the existing headworks structure, influent junction box, and primary electrical building. Additive alternative itemssuch as grit removal, alum dosing for enhanced phosphorusremoval, demolition, and miscellaneousimprovements are also included. The right is reserved by the LMUD, as its interest may require, to accept or reject any or all bids, and to waive any informality not involving price, time, or changes in the work in the bids received. Bid Security, only in the form of: 1) a certified or cashier's check drawn on a Texas bank and made payable to the LMUD; or 2) a bond executed by a surety company authorized to do businessin Texas, in the amount of not lessthan five (5%) percent of the total bid, must accompany each bid at the time it issubmitted. Bids must be submitted in duplicate. Bids may not be submitted electronically. Bids may be held by the LMUD for a period not to exceed 90 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and/or Section 608 of the Federal Water Pollution Control Act. Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Affirmative Action Requirement - Contracts awarded under this Invitation to Bids is expected to follow 40 CRF Part 7 regarding no discrimination on the basis of race, color, national origin, or sex. Davis-Bacon prevailing wage requirements apply to the construction, alteration, or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund Program (CWSRF). Upon award, the successful bidder will be required to furnish payment and performance bonds. Contracts awarded under this Invitation for Bids is expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees are or will be party to this bid. Bid award is contingent upon Texas Water Development Board approval. If the General Conditions or Supplemental Conditions conflict with the TWDB General and Supplemental Conditions, the TWDB General and Supplemental Conditions shall supersede. – The question cutoff date is being extended to June 25, 2025 at 12:00 PM Central Time

Bid Results

Water / Sewer

$54,849,365.00

Public - City

Renovation, Site Work

427

40

80

9

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
127
Bidding Soon
2,402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

September 13, 2025

Project location map

9043 Temple Rd, Lumberton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.