Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 20, 2025 at 8:00 PM
Updated October 21, 2025
Site work for a water / sewer project in Fulshear, Texas. Completed plans call for site work for a water / sewer project.
This project is to convert the existing conventional activated sludge plant into a wastewater treatment plant (WWTP) that focuses on mobile organic biofilm treatment to address the current and anticipated growth. The proposed design capacity is 3.0 mgd with a peak of 12.0 mgd to provide improved wastewater treatment capacity for the City of Fulshear (Owner). Complete treatment will be provided by the following unit processes: 1. Mechanical Screen - Installation of a new mechanical screen split structure with two (2) mechanical screens installed in each concrete channel. 2. Manual Bar Screen - Installation of new 1-inch manual bar screen installed in same concrete structure as the mechanical screen. 3. Grit Removal System (Additive Alternate) - Installation of one (1) new grit removal units with associated grit handling equipment. 4. Secondary Treatment System - Construction of new anoxic selector basins. Modification and retrofit of existing Aeration Basins with a Mobile Organic Biofilm (MOB). Includes a CMU building to house the MOB granular screens. Installation of pre-formed wet well and pumps for MOB return pump station. a. Additive Alternative - Construction of a new secondary clarifier. 5. Effluent Disinfection - Expansion of a chlorine and de-chlorination disinfection system with new concrete structures. 6. Solids Storage - Retrofit existing aerobic digesters to solids storage basins. 7. Solids Dewatering - Installation of new solids transfer pumps. Construction of new concrete pad and installation of two (2) new dewatering containers. a. Additive Alternative - Installation of a new mechanical dewatering system will be installed in the new dewatering building, with a trailer mounted dewatering system to meet TCEQ redundancy requirements. 8. Controls - New SCADA system will be installed for increased automation and remote monitoring capability.
Award
Water / Sewer
$2,583,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2025
August 4, 2025
Cross Crk W Blvd, Fulshear, TX
Related To This Project
Fulshear, TX
--
Fulshear, TX
Bid Date: May 12 2025
Fulshear, TX
Bid Date: May 29 2025
Fulshear, TX
Bid Date: May 15 2025
Fulshear, TX
Bid Date: Jun 17 2025
Fulshear, TX
Bid Date: Jun 17 2025
Fulshear, TX
--
Fulshear, TX
Bid Date: Jul 01 2025
Fulshear, TX
Bid Date: May 06 2025
Fulshear, TX
--
Fulshear, TX
Bid Date: Apr 29 2025
Fulshear, TX
Bid Date: Mar 22 2021
Fulshear, TX
Bid Date: Apr 15 2025
Fulshear, TX
Bid Date: Apr 08 2025
Fulshear, TX
Bid Date: Apr 01 2025