Site work for a water / sewer project in Fulshear, Texas. Completed plans call for site work for a water / sewer project.

This project is to convert the existing conventional activated sludge plant into a wastewater treatment plant (WWTP) that focuses on mobile organic biofilm treatment to address the current and anticipated growth. The proposed design capacity is 3.0 mgd with a peak of 12.0 mgd to provide improved wastewater treatment capacity for the City of Fulshear (Owner). Complete treatment will be provided by the following unit processes: 1. Mechanical Screen - Installation of a new mechanical screen split structure with two (2) mechanical screens installed in each concrete channel. 2. Manual Bar Screen - Installation of new 1-inch manual bar screen installed in same concrete structure as the mechanical screen. 3. Grit Removal System (Additive Alternate) - Installation of one (1) new grit removal units with associated grit handling equipment. 4. Secondary Treatment System - Construction of new anoxic selector basins. Modification and retrofit of existing Aeration Basins with a Mobile Organic Biofilm (MOB). Includes a CMU building to house the MOB granular screens. Installation of pre-formed wet well and pumps for MOB return pump station. a. Additive Alternative - Construction of a new secondary clarifier. 5. Effluent Disinfection - Expansion of a chlorine and de-chlorination disinfection system with new concrete structures. 6. Solids Storage - Retrofit existing aerobic digesters to solids storage basins. 7. Solids Dewatering - Installation of new solids transfer pumps. Construction of new concrete pad and installation of two (2) new dewatering containers. a. Additive Alternative - Installation of a new mechanical dewatering system will be installed in the new dewatering building, with a trailer mounted dewatering system to meet TCEQ redundancy requirements. 8. Controls - New SCADA system will be installed for increased automation and remote monitoring capability.

Award

Water / Sewer

$2,583,000.00

Public - City

Site Work

217

28

74

10

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
6
Bidding Soon
2,586
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 4, 2025

Project location map

Cross Crk W Blvd, Fulshear, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.