BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Site work and paving for a mixed-use development in Bolingbrook, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of June 04, 2025, project is awarded to Builders Paving, LLC., in the amount of $4,618,354.65. City/County : Bolingbrook Section 26-00000-01-GM Hot-mix asphalt surface removal and replacement, longitudinal joint sealant, sidewalk ADA ramp removal and replacement, sidewalk spot removal and replacement, curb and gutter removal and replacement, driveway removal and replacement, drainage structure adjustments and reconstructions, detector loop replacements, placement of thermoplastic and modified urethane pavement markings, pavement patching, and removal and replacement of speed tables Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Hot-Mix Asphalt Surface Removal and Replacement

Award

Roads / Highways

$4,618,355.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
240
Bidding Soon
3,279
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

August 1, 2025

Project location map

Multiple Locations, Bolingbrook, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.