BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work and paving for a civil project in Wrangell, Alaska. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Engineer’s Estimate for all work is approximately $1,900,000. The WORK is located at approximately 4.5 Mile Zimovia Highway, Wrangell, Alaska. City and Borough of Wrangell, Alaska will receive sealed bids for the construction of Alder Top Village Subdivision Phase I Roadway and Utilities. WORK consists of all activities necessary to construct the Alder Top Village Subdivision Phase I Roadway and Utilities as shown on the contract documents. The WORK generally includes mobilization, construction surveying, clearing and grubbing, archaeological monitoring, gravel roadway, water main and water services, sewer main and sewer services, coordination for trenching and backfill for local utilities' installation of electrical, phone and cable systems, and other improvements as identified in the project documents. Question Deadline 04/30/2025 Questions received less than 7 Days prior to the date for opening of Bids may not be answered. Substantial completion must be reached by September 30, 2025. Final Completion October 15, 2025 All communications relative to this WORK, prior to opening Bids, shall be directed to the following: Mike Howell, Senior Project Manager Telephone: (907) 874-3902 / (907) 305-0820 Email: mhowell@wrangell.com Each bid shall be accompanied by a bid bond, cashier's check or certified check made payable to the City and Borough of Wrangell in the amount of five percent (5%) of the total bid price The owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make award to the lowest responsive, responsible bidder as it may best serve the interests of the owner.

Award

Roads / Highways

$2,295,680.00

Public - City

Paving, Site Work

47

16

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
9
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

July 7, 2025

Project location map

Zimovia Hwy, Wrangell, AK


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.