Updated November 20, 2025

Site work and paving for a sidewalk / parking lot in Southbury, Connecticut. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work to be completed under this bid shall include, but not necessarily be limited to, mobilization and demobilization, installing pedestrian safety improvements along Main Street South and Poverty Road, and miscellaneous associated work. It is intended that this project be completed as directed by the Director of Public Works or his designee in accordance with the unit prices bid. The Town reserves the right to decrease the scope of the work to be done and to omit any work in order to bring the cost within available funds. To this end, the Town reserves the right to reduce the quantity of any items or omit any or all items as set forth in the bid at any time prior to the contractor's placement of an order for materials. The Town further reserves the right, at any time during the progress of the work, to restore all or part of any items previously omitted or reduced. Exercise by the Town of the above rights shall not constitute any ground or basis of claim for damages or for anticipated profits on the work omitted. No adjustment will be made in the unit price shown for any item in the bid schedule regardless of the quantity performed. This bid may be extended to include other similar work by mutual agreement of the Town and the contractor. No provision of this bid shall prevent the Town from bidding or awarding individual or separate contracts for projects containing identical or similar items of work as contained in this bid. The provisions of this bid may be extended to include other similar work by mutual agreement between the Town and the contractor. Pedestrian Safety Improvements project along Main Street South and Poverty Road. It is the intent of the Town to enter into a contractual agreement with one qualified Contractor to provide services. Each Bidder must deposit with his/her bid a bid bond for not less than five percent (5%) of the bid as provided in the Information for Bidders. A certified check will not be accepted in lieu of a Bid Bond. NO PROPOSAL WILL BE ACCEPTED UNLESS ACCOMPANIED BY THE REQUIRED BID BOND. The Contractor chosen for the project shall be required to furnish 100% Performance and Labor and Material bonds and proof of required insurance coverage. A Maintenance Bond, in the amount of ten percent (10%) of the contract sum shall be required after completion of the work and prior to final payment. No Bidder may withdraw their bid within one hundred twenty (120) days after the actual date of the opening thereof. Requests for Information (RFIs) concerning the project should be emailed to Matthew Tarnowski, Public Works Project Administrator, at MTarnowski@southbury-ct.gov. RFIs should be received by November 5, 2025. RFIs may not be directly responded to. If necessary, an addendum containing RFI responses will be posted to the Town of Southburys website at the link above by November 12, 2025. The right is reserved to reject any or all bids in whole or in part, to award any item, group of items, or total bid and to waive any informality or technical defects, if it is deemed to be in the best interest of the Town of Southbury. The Town of Southbury is an affirmative action, equal opportunity employer.

Post-Bid

Sidewalks / Parking Lot

$556,000.00

Public - City

Paving, Site Work

42

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
856
Active Projects
373
Bidding Soon
6,957
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

April 1, 2026

Project location map

Main St S, Southbury, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.