BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Site work for a water / sewer project in Grantsville, Utah. Completed plans call for site work for a water / sewer project.

The project includes the installation of a dedicated dump station featuring an OPW Sanitary Tank Hatch (Model 269) with a lockable, foot-operated mechanism, ensuring hygienic and user-friendly operation. A 50' x 43' reinforced concrete pad will be constructed to support vehicle maneuverability, with proper grading and drainage to prevent water accumulation. The station will be equipped with a 6-inch SDR35 PVC sewer lateral connecting to the existing sewer main at a minimum 1% slope for efficient waste disposal. To enhance safety and accessibility, the site will include ADA-compliant drinking water hydrants, pipe bollards for protection, and a solar-powered light pole (Dark Sky compliant) for visibility at night. The project is designed to meet Grantsville City and APWA standards, ensuring long-term sustainability, environmental protection, and a valuable amenity for RV travelers. Per Rocky Mountain Power: When trenching under the transmission lines to connect with the sewer, as with any development, the grading under the lines should not change from existing, no trenching within 20ft of any pole in any direction, and all OSHA clearances must be maintained when working around an energized 46kV transmission line. Date project will be awarded. May 7th 2025, 7:00 PM MDT Location : Grantsville City Office, 429 East Main Street, Grantsville, UT 84029 BID PROPOSALS RECEIVED AFTER DUE DATE AND TIME OR RECEIVED AT WRONG LOCATION ARE CONSIDERED NONRESPONSIVE AND SHALL BE REJECTED Deadline to submit Questions Apr 18th 2025, 2:00 PM MDT Location online portal. RFP Inquiries: All questions regarding RFP must be received no later than ten calendar days prior to proposal due date and must be submitted on Bonfire Warranty bond. Upon completion, a durability bond shall be submitted for 10% of the entire project cost, for the period of 1-year after acceptance by the City. In turn, the Construction bond will be released to the Consultant at that time. Construction bond required prior to project start date. The Construction bond shall be in the amount of the project in its entirety, plus the 15% contingency

Bid Results

Water / Sewer

$101,701.00

Public - City

Site Work

6

5

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
98
Bidding Soon
1,274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

May 28, 2025

Project location map

West Street, Grantsville, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.