BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2025 at 8:00 PM

Updated July 30, 2025

Demolition, site work, paving and new construction of a mixed-use development in San Jose, California. Completed plans call civil work for a sidewalk / parking lot and pre-engineered storage facility.

This is a Measure U Bond Program project. The Berryessa Union School District is seeking qualified and experienced licensed contractors to submit sealed bids for construction of a new warehouse building. The work consists of abatement and demolition of existing buildings, site clearing, underground utilities, building slab and construction of a pre-engineered metal building, interior buildout, fire alarm, security, data, sitework, ADA work, signage and all other associated work. PREQUALIFICATION - AB1565: This project is subject to Prime and M/E/P Contractor Prequalification. The last day to submit a prequalification package is May 20, 2025. If a bidder is not prequalified to bid on this Project, the District will not accept the bid. Prequalification documents are available for download at www.berryessa.k12.ca.us. Click the link for "Contractor Prequalification" under the Purchasing Department Page. PRE-BID CONFERENCE - There will be a Non-Mandatory Pre-Bid Conference and Job Walk for this project. The Pre-Bid Conference and Job Walk will begin at 11:30 am on April 22, 2025. Meet outside near the flagpole at the BUSD Corporation Yard, 945 Piedmont Road, San Jose, CA 95132. Contractors are not allowed to visit the site without being accompanied by the Construction Manager. CONSTRUCTION MANAGER - Strawn Construction, Inc. Donny Durham - Project Manager - ddurham@scmdinc.com - 408-313 0651 Ian Strawn - Project Engineer - istrawn@scmdinc.com - 408-835-9829 LAST DAY FOR QUESTIONS/RFIs: May 22, 2025 DIR REQUIREMENTS - Per SB854: No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The District shall award the Contract, if it awards it at all, to the lowest responsive and responsible bidder based on: The Base Bid.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$4,800,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

27

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
228
Bidding Soon
2,497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 20, 2025

Project location map

945 Piedmont Rd, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.