BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated May 29, 2025

Site work and paving for a sidewalk / parking lot in Page, Arizona. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of May 28, 2025, this solicitation has not been awarded as of yet. A firm timeline for the award date and project construction has not been disclosed. *The closed solicitation has been included below for reference: The City of Page was originally planned and developed in 1957 for the workers building the Glen Canyon Dam, and was incorporated in March of 1975. The City now functions as the home to about 7500 residents and the gateway to the breathtaking beauty of the Southwest. From the magnificent red rock formations of Antelope Canyon and Horseshoe Bend to the waters of Lake Powell and the Colorado River, Page is known as the center of adventure. Hosting over 4.5 million visitors per year in the City, the downtown area of Page should enhance both the quality of life for residents while at the same time containing adequate infrastructure to support events and the large influx of tourists and visitors to the City. The City is also culturally diverse with approximately 44% of its population identifying as Native American. Located adjacent to the Navajo Nation, Native American culture and heritage has a significant influence in the City. The City seeks to improve the aesthetic appeal of the downtown area while simultaneously improving walkability, safety, amenities and infrastructure to support the large numbers of visitors to the area. In support of these goals, the City has been awarded a $5,000,000 EDA federal grant and has budgeted approximately $4,000,000 of general funds for Phase 1. Time is of the essence for the project and the City requires that the selected firm be able to quickly produce quality work product. Public scoping and site selection shall be completed by August 15, 2025, and 100% construction drawings for Phase 1 shall be completed by or before February 2, 2026. All contact on this selection process should be addressed to the authorized representative identified below: Kyle Christiansen Director of Public Works P.O. Box 1180 Page, AZ 86040 kchristiansen@pageaz.gov 928.645.4302 Award of contract: May 14, 2025 This Agreement shall become effective on and from the date it is executed by the parties, and shall continue for a period of three (3) consecutive years, unless sooner terminated as provided in this Agreement. The Agreement may be renewed in writing for a supplemental period of up to two (2) additional one (1) year terms. The City Council authorizes the City Manager to administratively renew this Agreement for the additional terms specified in this paragraph. The Provider shall notify the City at least ninety (90) days prior to expiration of the Agreement if Provider wishes to renew the Agreement for the authorized additional one (1) year terms. The City Council may elect to renew the Agreement at the end of the two (2) additional one (1) year terms. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$1,849,000.00

Public - City

Paving, Site Work

3

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
37
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2026

Project location map

Multiple Locations, Page, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.