BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a bridge / tunnel in Stillwater, Minnesota. Completed plans call for site work for a bridge / tunnel.

8217-38 (TH 36=45) STATE FUNDS In Washington County on TH 36 at the St Croix River Traffic Control and Bridge #4654 0.20 Miles Site Directions: In Washington County on TH 36 at the St Croix River Description: Traffic Control and Bridge 4654 22% Min. 15% Women TGB 0 Vet 0 MNDOT: 113 - Traffic Control and Bridge 4654 CONTRACT ID: 250113 Question Deadline 10/01/2025 Direct questions about this Project, including pre-bid questions, to Eric Embacher at 651-775- 1158 and Eric.Embacher@state.mn.us.the Contractor must review and respond to all of the Engineers questions and concerns, adjust the schedule if needed, and resubmit to the Engineer within 7 calendar days.

Award

Bridges / Tunnels

$2,435,795.00

Public - State/Provincial

Site Work

49

7

4

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
146
Bidding Soon
1,620
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 19, 2025

Project location map

MN-36, Stillwater, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.