Demolition, site work, new construction and renovation of a power facility in Searcy, Arkansas. Conceptual plans call for site work for a power facility; for the demolition of a power facility; for the construction of a power facility; and for the renovation of a power facility.
Bailey Substation serves as both the SEAPA delivery point into the KPU system, and the main diesel generation delivery point. It last saw substation work in the late-1990's when Bailey Genenerator No. 4 (BAG4) was installed in the adjoining Bailey Powerhouse; prior to that was the early 1980's when the 115kV Swan Lake transmission line was brought into the station. Scoping and design work will be highly dependent on a second SEAPA delivery point being brought online, without which cost estimates will be significantly greater due to the challenges associated with maintaining hydro imports to KPU while conducting work within Bailey Substation. Work is anticipated to include replacement of diesel generator transformers, grounding transformer, 34.5kV breakers, bus work, gang-switches, grounding, conductors, communications, oil containment, and fencing. As of April 24, 2025 , This project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Power Plant
$15,300,000.00
Public - City
Demolition, New Construction, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2027
To Be Determined, Searcy, AR
Related To This Project
Searcy, AR
Bid Date: May 09 2025
Searcy, AR
Bid Date: Jun 05 2025
Searcy, AR
Bid Date: Jun 09 2025
Searcy, AR
Bid Date: Jul 07 2025
Searcy, AR
Bid Date: Jul 07 2025
Searcy, AR
Bid Date: Aug 05 2025
Searcy, AR
Bid Date: Aug 05 2025
Searcy, AR
Bid Date: May 21 2025
Searcy, AR
Bid Date: May 06 2025
Searcy, AR
Bid Date: Apr 21 2025
Searcy, AR
Bid Date: Apr 24 2025
Searcy, AR
Bid Date: Apr 09 2025
Searcy, AR
Bid Date: Jun 09 2025
Searcy, AR
Bid Date: Feb 27 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.