BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a municipal facility.

Election Operations Center & Southwest Shop - Boiler Replacement(s). Time for Completion: 80 Working Days. Boilers and pumps shall be fully operational no later than October 15, 2025. Liquidated Damages, per diem: $455.00 A. Work illustrated in documents applies to the Boiler Replacement(s) at Election Operations Center - 1901 S Kinnickinnic Ave, Milwaukee, Wisconsin 53204 and Southwest Shop - 2657 S 31st St, Milwaukee, Wisconsin 53215. B. Base Bid: C. The existing boiler plant will be replaced entirely with two new high efficiency condensing boilers and new accessories. All heating plant equipment shall be replaced including but not limited to pumps, expansion tank, air separator, manual chemical feed, and nearby piping. Pumps to be designed with 100% redundancy. Controls to be designed around city contracted Johnson Controls as the only acceptable manufacturer to match existing system. D. UNIT PRICE #1:The replacement of the boiler plant components located at Election Operations Center - 1901 S Kinnickinnic Avenue, Milwaukee, WI 53204 as specified in the contract documents. E. UNIT PRICE #2:The replacement of the boiler plant components located at Southwest Shop - 2657 S 31st Street, Milwaukee, WI 53215 as specified in the contract documents. F. Contract Award: Base Bid = Summation of Unit Prices 1 and 2 inclusive. G. SBE requirement is applicable to the Base Bid only. H. It is understood that the submittal of a proposal shall include furnishing all labor, materials, equipment, and incidentals necessary for completion of the work required, including that which may not be directly shown on the drawings or in the specifications, but are necessary for proper operation and approval. All questions should be submitted in writing prior to 12:00 PM on Friday, May 9, 2025 to dpitts@milwaukee.gov. No questions may be answered after that date and time. No questions shall be answered verbally. No verbal information from any source is to be relied upon by any respondent in the development of their Bid. Written questions and responses will be documented by way of addenda, which will be forwarded to all bidders. Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, within 24 hours upon being notified that they are the apparent low bidder. The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. The SBE requirement for this project is 5% of the contract base bid.

Award

Municipal

$379,110.00

Public - City

Renovation

18

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
186
Bidding Soon
2,110
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 13, 2025

Project location map

Multiple Locations, Milwaukee, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.