Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2025 at 8:00 PM
Updated June 19, 2025
Site work for a water / sewer project in Okeechobee, Florida. Completed plans call for site work for a water / sewer project.
The Work is generally described as follows: The installation of approximately 2,955 linear feet of 16-inch PVC water main, 20 linear feet of 185-inch PVC water main, 865 linear feet of 18-inch directionally drilled DR-11 High Density Polyethylene water main, one (1) 8” water main connection with 15 LF of new water main, and one (1) 6” water main connection with 15 LF of new water main. Work will include the installation of the water main, water main connections, existing water main removal or abandonment, and restoration of the affected areas to existing or better condition. BIDDER agrees that the Work will be complete within 150 calendar days from the date when the Contract Time commences to run as provided in paragraph 2.3 of the General Conditions, and completed and ready for final payment within 180 calendar days from the date when the Contract Time commences to run.
Award
Water / Sewer
$654,530.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2025
July 2, 2025
FL-78, Okeechobee, FL
Related To This Project
Okeechobee, FL
Bid Date: Jun 02 2025
Okeechobee, FL
Bid Date: Aug 21 2020
Okeechobee, FL
Bid Date: Apr 21 2021
Okeechobee, FL
Bid Date: Sep 30 2019
Okeechobee, FL
Bid Date: Jun 11 2025
Okeechobee, FL
--
Okeechobee, FL
Bid Date: Jun 25 2025
Okeechobee, FL
Bid Date: May 30 2025
Okeechobee, FL
Bid Date: May 15 2025
Okeechobee, FL
Bid Date: May 12 2025
Okeechobee, FL
Bid Date: Apr 25 2025
Okeechobee, FL
Bid Date: Apr 29 2025
Okeechobee, FL
Bid Date: Apr 09 2025
Okeechobee, FL
--
Okeechobee, FL
Bid Date: Mar 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
