Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and paving for a road / highway in Okeechobee, Florida. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of November 5, 2025, the project is in design. A general contractor or a selection method has not been disclosed. A firm construction timeline has not been disclosed. FPID: 453333-3 (goes with 447555-1 and 447555-2) SR 710 corridor from Martin/Okeechobee County Line to FPL Power Plant Access Road and from Warfield Boulevard to Okeechobee/Martin County Line extends for approximately 10.127 miles in Martin and Okeechobee Counties. SR 710 is identified as a strategic intermodal system (SIS) facility moving traffic northwest and southeast throughout Martin County. The objective of this project is to enhance mobility, safety, emergency access and truck movement in Martin County. The corridor serves as a major arterial particular for freight. The SR 710 Corridor Capacity Improvements Project will consider: Widen from a 2-lane undivided roadway to 4-lane divided roadway Realign the intersection between Martin Highway and SE 126th Boulevard Add traffic signal to various intersections between Martin Highway and SE 126th Boulevard Improve intersections to accommodate heavy truck traffic *The closed solicitation has been included below for reference: District : 04 Selection Method : Letter of Response and Interview Project Description : SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road Plain Language Description : Design Services for SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road. Advertisement Date 1/09/2024 Response Deadline Date/Time 1/24/2024 03:30 am Shortlist Selection Date/Time 2/12/2024 07:45 pm Final Selection Date/Time 3/18/2024 06:45 pm Negotiations Period Begin Date 3/23/2024 Negotiations Period Ending Date 5/25/2024 The method of contractor selection has not been determined at this time. FL DOT - RFP Engineering - SR-710 from W of SE 126 Bike Lane to CR-609/Allapatah Road
Design
Roads / Highways
$9,265,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2029
FL-710, Okeechobee, FL
Related To This Project
Okeechobee, FL
Bid Date: Jun 25 2025
Okeechobee, FL
Bid Date: May 30 2025
Okeechobee, FL
Bid Date: May 28 2025
Okeechobee, FL
Bid Date: Jul 02 2025
Okeechobee, FL
Bid Date: Jun 17 2025
Okeechobee, FL
Bid Date: Jul 02 2025
Okeechobee, FL
Bid Date: Jun 10 2025
Okeechobee, FL
Bid Date: Jun 23 2025
Okeechobee, FL
Bid Date: Jun 11 2025
Okeechobee, FL
Bid Date: Sep 30 2019
Okeechobee, FL
Bid Date: Apr 21 2021
Okeechobee, FL
Bid Date: Aug 21 2020
Okeechobee, FL
Bid Date: Jun 02 2025
Okeechobee, FL
Bid Date: Jun 09 2025
Okeechobee, FL
Bid Date: May 15 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
