Published May 27, 2025 at 8:00 PM
Updated May 28, 2025
Site work and paving for a mixed-use development in Omaha, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work consists essentially of the following estimated quantities: APPROXIMATE QUANTITIES BID ITEM DESCRIPTION QUANTITY UNIT 1. Mobilization / Demobilization 1 LS 2. Maintain Traffic Control 1 LS 3. Clearing and Grubbing - General 1 LS 4. Clearing and Grubbing - Trees Over 9'' To 18" Diameter 14 EA 5. Clearing and Grubbing - Trees Over 18'' To 27" Diameter 2 EA 6. Install Curb Inlet Protection 2 EA 7. Remove and Reinstall Fence 165 LF 8. Construct Sheet Pile 2,640 SF 9. Construct 3" Perforated Underdrain Pipe 90 LF 10. Embankment Borrow 40 CY 11. Repair Curb and Gutter 17 LF 12. Repair 4" Sidewalk - Small Area 12 SF 13. Repair Driveway 105 SY 14. Place Topsoil 95 SY 15. Install Seeding - Type 'Channel Seed Blend' 95 SY 16. Install Rolled Erosion Control - Type I 95 SY 17. Install Sodding 240 SY 18. Install Wood Chip Mulch 4 CY 19. Install Common Hackberry Plant Material 3 EA 20. Install Skyline Honeylocust Plant Material 2 EA 21. Install Frontier Elm Plant Material 2 EA 22. Install American Hornbeam Plant Material 2 EA 23. Install Colorado Blue Spruce Plant Material 1 EA All proposals must be submitted on bid forms furnished by E & A Consulting Group, Inc., and must be accompanied by an original bid bond or a certified check in the amount of not less than $14,400.00 made payable to the Treasurer of Sanitary and Improvement District No. 503 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor, and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of THIRTY (30) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed, and addressed to the Clerk of Sanitary and Improvement District No. 503, and shall be marked "Bank Stabilization", with the bidder's name and address on said envelope. The bid security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. Plans, specifications, and contract documents governing the above-referenced proposal as prepared by E & A CONSULTING GROUP, INC., 10909 MILL VALLEY ROAD, SUITE 100, OMAHA, NEBRASKA, are hereby made a part of this notice. The proposed contract shall be executed in compliance therewith. Sanitary and Improvement District 503 of Douglas County, Nebraska, reserves the right to reject any or all bids received and to waive informalities and irregularities. SCOPE OF WORK 4.01 Intent of Contract The Contract's intent is to provide for the construction and completion in every detail of the work described. The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and all incidentals required to complete the work in accordance with the Contract Documents. The Engineer will provide the Contractor one (1) complete copy of the Contract Documents. The Contractor shall have this complete copy available on the work site at all times. The Engineer will provide six (6) copies of all plans, specifications, and addenda at no cost to the Contractor. The Engineer may furnish additional copies for a fee. 4.02 Alteration of Plans or Character of Work The Engineer reserves the right to alter the following: • Contract item quantities; • Construction details; or • Roadway, sewer, structure, or facility grade or alignment. Alterations will not waive or invalidate any Contract provisions. If the alteration increases or decreases the total original estimated Contract sum by twenty-five (25) percent or more, the Owner may execute a supplemental agreement with the Contractor. Work on an alteration requiring a supplemental agreement shall not begin until all parties have executed such agreement. Upon submitting a proposal, the Contractor acknowledges that the quantities contained in the proposal forms, unless otherwise indicated in the Contract Documents, are estimates that may vary. No claims for anticipated profit, profit loss, or any other damage due to variation between the proposal and the actual quantities are allowed. 4.03 Extra Work The Contractor shall perform extra work in accordance with the Contract Documents or as directed by the Engineer. The Engineer must recognize the extra work in writing before the Contractor performs such work. The Engineer shall provide the Contractor an Extra Work Order indicating the mutually agreed upon payment format before extra work is performed. If no such payment format exists, the Contractor will perform extra work as force account work. The Contractor has the right to appeal an Engineer's judgment of whether work done by the Contractor constitutes extra work. Such appeals must be in writing. The Contractor must submit the appeal no later than seven (7) calendar days after completing such work. The Engineer reserves the right to halt work performed under an extra work order in accordance with these specifications. 4.04 Maintenance of Detours Unless otherwise indicated in the Contract Documents, the Contractor shall not close a traveled way without the express permission of the Traffic Engineer of the Local Jurisdiction. When indicated in the Contract Documents, the Contractor shall assume all responsibility for providing and maintaining detours around the work. The Contractor shall close or open detour routes in accordance with the requirements of the most current version of the Manual of Uniform Traffic Control Devices (MUTCD) and the City of Omaha Barricading Standards, Specifications, Methods, and Materials. The Contractor shall provide access to local traffic within the project, as practicable, in accordance with the Contract Documents or as directed by the Engineer. The Contractor is responsible for maintaining any temporary approaches or crossings. 4.05 Removal and Disposal of Surplus Materials, Discarded Materials, Rubbish, Debris, Structures, and Obstructions Unless otherwise indicated in the Contract Documents, the Contractor shall remove any existing structures that are not to remain in place. Existing structures are to remain in place until the replacement structures are complete unless such existing structures interfere with the work. As directed by the Engineer, any materials deemed fit for use elsewhere shall remain the property of the Owner. The Contractor shall remove such materials without damage in readily transportable sections. The Owner reserves the right to retain ownership of all surplus materials. As directed by the Engineer, the Contractor shall deliver any retained surplus materials to a designated facility. The Contractor shall remove and dispose of any obstructions or surplus materials encountered and not retained by the Owner at no additional expense to the Owner. The Contractor shall thoroughly wash any pavement, walks, gutter lines, or other constructed items to remove soil or other foreign materials throughout the course of the project as directed by the Engineer. The Contractor shall remove and dispose of all discarded materials, rubbish, or debris at no additional expense to the Owner in accordance with all Local, State, and Federal regulations and laws. The Contractor shall remove such material within twenty-four (24) hours of the Engineer requesting that the Contractor remove the materials. The Owner may remove from the site, at the Contractor's expense, any surplus or discarded materials (including existing manholes and inlets on site), rubbish, or debris remaining after twenty-four hours. The Contractor shall mow all areas of the project where vegetation growth exceeds eighteen (18) inches in height at no additional cost to the Owner. The Contractor shall cut such vegetation as close to the ground as possible. The Contractor shall rake and remove the cuttings from the premise immediately. 4.06 Rights In and Use of Materials Found on the Project The Contractor may use stone, gravel, or other materials found within the excavation limits as designated by the Engineer or the Contract Documents. All materials are subject to approval by the Engineer. Payment for the excavation of such items will be at the corresponding Contract Price therefore. The Contractor shall replace such material as was contemplated for use in embankments, backfill, approaches, or otherwise with other suitable material at no additional expense to the Owner. The Contractor shall not excavate or remove any material outside of the excavation limits without written authorization from the Engineer. The Engineer may permit the temporary use of material from an existing structure for erection of a new structure unless otherwise indicated in the Contract Documents. The Contractor shall not use such material without approval of the Engineer 4.07 Final Clean Up Upon completion of the work, the Contractor shall leave the project site in a neat and presentable condition as determined by the Engineer. At a minimum, the Contractor shall remove all rubbish, excess materials, falsework, temporary structures, equipment, and any other items not included in the final project. The Contractor shall dispose of any trees, stumps, or other removed materials placed on properties adjacent to the project as indicated in these specifications. The Engineer shall not authorize final payment and acceptance of the work until such conditions are met. 4.08 Special Requirements Exposing Existing Utilities - The Contractor shall, without extra compensations, furnish all labor and equipment to make all test holes, excavations and other work required at any time when directed by the engineer for the purpose of determining the location and elevation of existing conduits and/or structures located beneath the surface of the ground. Sewer Mains - The contractor shall deliver to the owner a complete sewer system in accord with the plans and specifications. All sewer mains, including the service lines and/or stubs shall be completely cleaned of mud, water, dirt, debris and foreign materials. Approval of each sewer line of 8-inch diameter and above will be subject to testing by a television camera. The contractor, if necessary as determined by the engineer, shall flush all sewers to allow the television cameras to transverse through the sewer mains. It may be necessary to televise certain sewer lines prior to the completion of the entire sewer system, if so, the contractor shall, upon request of the engineer, flush and clean the sewer mains that were so requested. If the contractor fails to clean the sewer mains within three calendar days after notification by the engineer, then the engineer will cause said cleaning work to be accomplished by others and the contractor shall be liable to pay said costs.
Award
Sidewalks / Parking Lot
$244,899.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2025
June 6, 2025
To Be Determined, Omaha, NE
Related To This Project
Omaha, NE
Bid Date: May 19 2025
Omaha, NE
Bid Date: May 14 2025
Omaha, NE
Bid Date: May 14 2025
Omaha, NE
Bid Date: Jul 10 2025
Omaha, NE
Bid Date: May 22 2025
Omaha, NE
Bid Date: May 16 2025
Omaha, NE
Bid Date: May 13 2025
Omaha, NE
Bid Date: May 15 2025
Omaha, NE
Bid Date: May 01 2025
Omaha, NE
Bid Date: Oct 15 2025
Omaha, NE
Bid Date: May 20 2025
Omaha, NE
Bid Date: May 13 2025
Omaha, NE
Bid Date: May 08 2025
Omaha, NE
Bid Date: May 07 2025
Omaha, NE
Bid Date: May 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.