BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

This is a service / maintenance or supply contract in Omaha, Nebraska. Contact the soliciting agency for additional information.

Waste Collection - Trash and Yardwaste (1 Cart)49 Ea12.waste Collection - Recycling (1 Cart)49 Ea2027 Monthly Subtotal Estimated Contract Cost2027 Subtotal Estimated Contract Cost -(January 1, 2027, Through December 31, 2027)(Multiply Monthly Subtotal by 12 Months). Total Estimated Contract Cost -july 1, 2025, Through December 31, 2027(Alternate Bid Items 7-12)total Estimated Project Cost Alternate The Engineer's estimate of the construction or other effectuation of all of such improvementsand work is $34,692.00. Each bid must be accompanied in a SEPARATE SEALED ENVELOPE by a certified check drawn on a bank whose deposits are insured by the Federal Deposit Insurance Corporation in-the amount of $1,735.00, payable without condition to the Treasurer, Sanitary and Improvement District No. 584 of Douglas County, Nebraska, or a bid bond for a like amount as evidence of goodfaith of the bidder and as agreed upon liquidated damages to the District in the event the bidderwhose proposal is accepted by the Board of Trustees of the District fails to enter into contract withinten (10) days after Notice of Award and furnish acceptable bond to complete the work and pay forall labor done and materials used, such bond to be in the amount of 100% of the total bid price. No bidder may withdraw his proposal for a period of thirty (30) days after the date set for theopening of bids.Sanitary and Improvement District No. 584 of Douglas County, Nebraska, reserves the right towaive informalities and to reject all or any bids. For the furnishing of all labor, materials, use of Contractor's equipment, plant andall else necessary to construct properly all of the improvements within the improvement generallydesignated Waste Collection 2025 (Heartwood Estates), Sanitary and Improvement DistrictNo. 584 of Douglas County, Nebraska.At such hour, or as soon as practicable thereafter, the Board of Trustees of the District willproceed to open in the presence of all bidders and consider the bids received for the furnishing ofsuch labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listedbelow and other related preparatory and subsidiary work from issuance of the Notice to Proceed :itemapproximateno.descriptionquantitybase Bid(1 Waste Cart, 1 Recycling Cart, Every-other-week Recycling)july 1, 2025, Through December 31, 2025. 1.waste Collection - Trash and Yardwaste (1 Cart)49 Ea2.waste Collection - Recycling (1 Cart)49 Ea2025 Monthly Subtotal Estimated Contract Cost2025 Subtotal Estimated Contract Cost -(July 1, 2025, Through December 31, 2025)(Multiply Monthly Subtotal by 6 Months)january 1, 2026, Through December 31, 20263.waste Collection - Trash and Yardwaste (1 Cart)49 Ea4.waste Collection - Recycling (1 Cart)49 Ea2026 Monthly Subtotal Estimated Contract Cost2026 Subtotal Estimated Contract Cost -(January 1, 2026, Through December 31, 2026)(Multiply Monthly Subtotal by 12 Months)january 1, 2027, Through December 31, 20275.waste Collection - Trash and Yardwaste (1 Cart)49 Ea6.waste Collection - Recycling (1 Cart)49 Ea2027 Monthly Subtotal Estimated Contract Cost2027 Subtotal Estimated Contract Cost -(January 1, 2027, Through December 31, 2027)(Multiply Monthly Subtotal by 12 Months)total Estimated Contract Cost -july 1, 2025, Through December 31, 2027 (Base Bid Items 1-6)total Estimated Project Cost - Basealternate Bid(1 Waste Cart, 1 Recycling Cart, Every-week Recycling)july 1, 2025, Through December 31, 20257.waste Collection - Trash and Yardwaste (1 Cart)49 Ea8.waste Collection - Recycling (1 Cart)49 Ea2025 Monthly Subtotal Estimated Contract Cost2025 Subtotal Estimated Contract Cost -(July 1, 2025, Through December 31, 2025)(Multiply Monthly Subtotal by 6 Months)january 1, 2026, Through December 31, 20269.waste Collection - Trash and Yardwaste (1 Cart)49 Ea10.waste Collection - Recycling (1 Cart)49 Ea2026 Monthly Subtotal Estimated Contract Cost2026 Subtotal Estimated Contract Cost -(January 1, 2026, Through December 31, 2026)(Multiply Monthly Subtotal by 12 Months)this Document is Intended for Internal Research Purposes Only.

Post-Bid

Roads / Highways

$34,692.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
95
Bidding Soon
953
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 1, 2025

Project location map

Multiple Locations, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.