Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Site work and paving for a mixed-use development in Omaha, Nebraska. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
2025 Trail, Sidewalk & Curb Ramp Improvements for furnishing al: labor, tools, materials, and equipment required to perform 2025 TRAIL, SIDEWALK & CURB RAMP IMPROVEMENTS The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $107,400.00. All proposals must be submitted on bid forms furnished by & & A Consulting Group, Inc., and must be accompanied by an original bid bond or a Certified check in the amount of not less than $5,370.00 made payable to the Treasurer of Sanitary and Improvement District No. 237 as security that the bidder to whom the contract may be awarded will enter into a contract to build the Improvements in accordance with this Notice to Contractor, and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of THIRTY (30) days after date set for opening of bids. The bid security shall be in a separate sealed envelope attached to the Proposal envelope and shall be marked "810 SECURITY" the project identified thereon, Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. Sanitary and Improvement District 237 of Sarpy County, Nebraska, reserves the right to reject any or all biis received and to waive informalities and irregularities SCOPE OF WORK 4.01 Intent of Contract The Contract's intent is to provide for the construction and completion in every detail of the work described. The Contractor shall furnish all labor, materials, equipment, tools, transportation, supplies, and all incidentals required to complete the work in accordance with the Contract Documents. The Engineer will provide the Contractor one (1) complete copy of the Contract Documents. The Contractor shall have this complete copy available on the work site at all times. The Engineer will provide six (6) copies of all plans,specifications, and addenda at no cost to the Contractor. The Engineer may furnish additional copies for a fee. 4.02 Alteration of Plans or Character of Work The Engineer reserves the right to alter the following: • Contract item quantities; • Construction details; or • Roadway, sewer, structure, or facility grade or alignment. Alterations will not waive or invalidate any Contract provisions. If the alteration increases or decreases the total original estimated Contract sum by twenty-five (25) percent or more, the Owner may execute a supplemental agreement with the Contractor. Work on an alteration requiring a supplemental agreement shall not begin until all parties have executed such agreement. Upon submitting a proposal, the Contractor acknowledges that the quantities contained in the proposal forms, unless otherwise indicated in the Contract Documents, are estimates that may vary. No claims for anticipated profit, profit loss, or any other damage due to variation between the proposal and the actual quantities are allowed.
Award
Roads / Highways
$60,486.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 22, 2025
June 23, 2025
Multiple Locations, Omaha, NE
Related To This Project
Omaha, NE
Bid Date: May 16 2025
Omaha, NE
Bid Date: May 13 2025
Omaha, NE
Bid Date: May 15 2025
Omaha, NE
Bid Date: Aug 15 2025
Omaha, NE
Bid Date: May 14 2025
Omaha, NE
Bid Date: May 22 2025
Omaha, NE
Bid Date: May 13 2025
Omaha, NE
Bid Date: May 09 2025
Omaha, NE
Bid Date: Jul 10 2025
Omaha, NE
Bid Date: May 14 2025
Omaha, NE
Bid Date: May 14 2025
Omaha, NE
Bid Date: May 19 2025
Omaha, NE
Bid Date: May 07 2025
Omaha, NE
Bid Date: May 01 2025
Omaha, NE
Bid Date: Oct 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.