BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work and paving for a transportation facility in Gypsum, Colorado. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

This project shall consist of the construction of a portion of the planned/proposed parallel Taxiway B, which will be north of the current Runway 7-25. This project will be for the first phase of construction and paving of new parallel Taxiway B. This follows the two previous projects focused on Taxiway B which were two embankment and drainage improvement projects. The first embankment project was completed in Summer 2022 and the second embankment project was completed in Summer 2024. With Taxiway B being constructed, it is anticipated that future development will occur on the north side of the airport. This development will be for aeronautical purposes and could potentially bring a variety of different aircrafts. For this reason, new Taxiway B will be designed to accommodate ADG III/TDG IV aircraft. Connector Taxiway B4 will be relocated as a part of this project and a connection to the HAATS apron will be made as well. Also included in this project will be drainage improvements and storm sewer infrastructure on the north side of the airport. These stormwater drainage infrastructure improvements will include piping, inlets, manholes, and potentially outfall structures. Taxiway B will not include centerline lighting or taxiway edge lights but will have retroreflective taxiway edge markers installed as a part of this project.

Award

Transportation Terminals

$3,088,881.00

Public - County

Paving, Site Work

91

6

10

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
29
Bidding Soon
219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

June 20, 2025

Project location map

219 Eldon Wilson Rd, Gypsum, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.