Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2025 at 8:00 PM
Updated May 10, 2025
Site work for a civil project in Sharon, Wisconsin. Completed plans call for site work for a bridge / tunnel; and road / highway.
Tremaine Road: Milling Butt Joint HMA Pavement Base Aggregate Dense 15-inch Culvert Salt Box Road: 72-inch Culvert 42-inch Culvert 18-inch Culvert HMA Pavement Base Aggregate Dense Riprap with Fabric Est. Completion Date: Sept. 26, 2025 Site Directions: Tremaine Road: CTH X - Clinton Street Salt Box Road: Stateline Road - STH 67 The Contractor shall perform everything required to be performed and shall provide and furnish all the labor, materials, equipment, necessary tools, expendable equipment, insurance provided by the specifications, contributions to Social Security and all utility and transportation services required to perform and complete, in a workmanlike manner, the following work: PROJECT: TSHR 2025-01: TREMAINE ROAD OVERLAY (LRIP/TRI PROJECT) CTH X TO CLINTON STREET SALT BOX ROAD CULVERT REPLACEMENT (NON-LRIP PROJECT) STATELINE ROAD TO STH 67 TOWN OF SHARON, WALWORTH COUNTY all in strict accordance with the specifications and drawings and in strict compliance with the Contractor's proposal and other Contract documents, herein mentioned as component parts of this Contract. The Contractor shall do everything required by this Contract and by other documents constituting a part thereof and in the manner specified herein.
Bid Results
Bridges / Tunnels
$160,498.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
June 9, 2025
Tremaine Rd & Salt Box Rd, Sharon, WI
Related To This Project
Sharon, WI
Bid Date: Jun 12 2025
Sharon, WI
Bid Date: Apr 17 2026
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Mar 10 2025
Sharon, WI
Bid Date: Oct 03 2024
Sharon, WI
--
Sharon, WI
--
Sharon, WI
Bid Date: Jun 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
