BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work for a civil project in Sharon, Wisconsin. Completed plans call for site work for a bridge / tunnel; and road / highway.

Tremaine Road: Milling Butt Joint HMA Pavement Base Aggregate Dense 15-inch Culvert Salt Box Road: 72-inch Culvert 42-inch Culvert 18-inch Culvert HMA Pavement Base Aggregate Dense Riprap with Fabric Est. Completion Date: Sept. 26, 2025 Site Directions: Tremaine Road: CTH X - Clinton Street Salt Box Road: Stateline Road - STH 67 The Contractor shall perform everything required to be performed and shall provide and furnish all the labor, materials, equipment, necessary tools, expendable equipment, insurance provided by the specifications, contributions to Social Security and all utility and transportation services required to perform and complete, in a workmanlike manner, the following work: PROJECT: TSHR 2025-01: TREMAINE ROAD OVERLAY (LRIP/TRI PROJECT) CTH X TO CLINTON STREET SALT BOX ROAD CULVERT REPLACEMENT (NON-LRIP PROJECT) STATELINE ROAD TO STH 67 TOWN OF SHARON, WALWORTH COUNTY all in strict accordance with the specifications and drawings and in strict compliance with the Contractor's proposal and other Contract documents, herein mentioned as component parts of this Contract. The Contractor shall do everything required by this Contract and by other documents constituting a part thereof and in the manner specified herein.

Bid Results

Bridges / Tunnels

$160,498.00

Public - City

Site Work

21

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
710
Active Projects
356
Bidding Soon
5,567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2025

June 9, 2025

Project location map

Tremaine Rd & Salt Box Rd, Sharon, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.