BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Demolition, site work, paving and new construction of a civil project in Bashaw Township, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of June 4, 2025 this project was awarded to Midwest Contracting, LLC in the amount of $202,816.25 Location: Bashaw Township, 110th St Type of Work: Bridge Replacement, Township Major Items: 2106.507 Common Embankment (Cv) 429 C.y. 2106.507 Excavation - Common 1252 C.y. 2118.507 Aggregate Surfacing Class 5 (Cv) 90 C.y. 2412.502 14' X 10' Precast Concrete Box Culvert End Section 2 Each 2412.503 14' X 10' Precast Concrete Box Culvert 48 L.f. 2442.501 Remove Existing Bridge 1 L.s. 2451.507 Aggregate Backfill (Cv) 405 C.y. 2563.601 Traffic Control 1 L.s. 2575.501 Turf Establishment 1 L.s. 2575.504 Rolled Erosion Prevention Category 25 1250 S.y. Bids must be sealed, identified on the envelope and accompanied by a Bidder's Bond or Certified Check in an amount equal to at least 5% of the total bid made payable to the Brown County Treasurer. The Brown County Highway Department reserves the right to reject any or all bids and to waive any irregularities thereof. MNDOT: Bridge Replacement, Township

Award

Bridges / Tunnels

$202,816.00

Public - County

Demolition, New Construction, Paving, Site Work

11

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
57
Bidding Soon
717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

September 8, 2025

Project location map

110th St, Bashaw Township, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.