Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and paving for a mixed-use development in Fort Lupton, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Reference Number 0000385228 Various sites throughout the city require patchback from pipe repairs. Additionally, multiple sites require the reconstruction of various concrete work such as curb and gutter, sidewalk, curb ramps and other work related to maintenance and repair. Question Deadline 05/20/2025 at 12:00 PM MT Questions are submitted online No All questions about the meaning or the intent of the Project Manual shall be submitted to the Engineer in writing The Substantial Completion Date for this project is September 26, 2025. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A Proposal Guaranty consisting of a Bid Bond, a properly Certified Check, or a Cashier's Check in the amount of five percent (5%) of the Bidder's Proposal Price is required. The successful Bidder shall be required to furnish Performance and Payment Bonds which meet all the requirements of Colorado C.R.S. 38-26-105, Public Works Contractor's Bond - Conditions, and Colorado C.R.S. 38-26-106, Contractor Executes Bond, acceptable to the City, in a penal sum equal to the nearest integral one-hundred and no-hundredths Dollars ($ 100.00) in excess of the estimated Proposal Price. The City of Fort Lupton, Colorado, reserves the right to reject any and/or all Proposals including, without limitation, the right to reject any and/or all nonconforming, nonresponsive, unbalanced, or conditional Proposals, and to reject the Proposal of any Bidder if the City believes that it would not be in the City's best interests to make an Award to that Bidder. The City also reserves the right to waive informalities. Bid result - Sch 1 Total - Top Notch Pavement Solutions - 77,990.30 Sch 2 Total - A-1 Chipseal - 83,396.00
Award
Sidewalks / Parking Lot
$161,386.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2025
June 30, 2025
Multiple Locations, Fort Lupton, CO
Related To This Project
Fort Lupton, CO
Bid Date: Jun 06 2025
Fort Lupton, CO
Bid Date: May 23 2025
Fort Lupton, CO
Bid Date: Jun 16 2025
Fort Lupton, CO
Bid Date: Jul 14 2025
Fort Lupton, CO
Bid Date: Aug 22 2025
Fort Lupton, CO
Bid Date: Aug 22 2025
Fort Lupton, CO
Bid Date: Sep 12 2025
Fort Lupton, CO
Bid Date: Jul 16 2025
Fort Lupton, CO
Bid Date: May 19 2025
Fort Lupton, CO
Bid Date: Apr 28 2025
Fort Lupton, CO
Bid Date: Jun 16 2025
Fort Lupton, CO
Bid Date: Apr 17 2025
Fort Lupton, CO
Bid Date: Feb 24 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
