Site work for a water / sewer project in Fort Lupton, Colorado. Completed plans call for site work for a water / sewer project.
**As of September 12th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000390932 The North Campus Radial Collector Well 02 Project (RCW 02 Project) will expand the City of Aurora's (City) North Campus Well Field (Well Field) water supply facilities to continue to build on existing water rights utilized along the South Platte River. The City's existing Well Field is located along the bank of the South Platte River approximately midway between Brighton and Fort Lupton. The RCW 02 Project is located along the east bank of the South Platte River just south of Weld County Road 8. Selecting qualified Licensed Trenchless Tunneling Subcontractors for the North Campus Radial Collector Well 02 (Project). Those Licensed Trenchless Tunneling Subcontractors selected through this solicitation will be cited in the Project's technical specifications as the sole Licensed Trenchless Tunneling Subcontractors allowed to submit pricing to the Project's Collector Well Drilling subcontractors for installation of the trenchless drilled laterals (pipelines) proposed under the Project. The Project's Collector Well Drilling subcontractors will be prequalified under a separate solicitation (anticipated posting in mid-July). The Project's prime/general contractors will be prequalified under a separate solicitation (anticipated posting in mid-July, concurrent with drillers). The Project is anticipated to bid in September 2025 with contract award in November 2025 Project work will be performed at the City's North Campus Well Field in Weld County near the intersection of Highway 85 and Weld County Road 8. The estimated value of this work is $2,000,000 Question Deadline 07/07/2025 at 2:00 PM MT Questions are submitted online No, All questions shall be submitted via email to Justin Montes, Project Manager, at jmontes@auroragov.org AND Nathan Jones, Contract Administrator, via email at njones@aurora.gov.org. Telephone inquiries will be accepted only for procedural questions by calling Nathan Jones at 303-739-7343. Responses will be posted via addendum posted to online. The City of Aurora and its consultant reserve the right to contact any or all parties given as references to verify the information provided The Collector Well Drilling Subcontractor will construct the central 20-foot diameter concrete caisson. The caisson will be constructed from ground surface to bedrock with a concrete floor, creating a watertight pump station wet well. A total of ten (10) horizontal screened laterals will be drilled radially from the bottom of the central caisson well shaft. The Collector Well Subcontractor will construct eight (8) of the horizontal screened laterals using their conventional and proprietary drilling methods. These will be approximately 200-feet in length for a total of 1,600-lf Critical tunneling considerations include: - Operating in relatively dense cobbled areas - Portal stability at the central shaft - Face stability of the tunnel - No usage of pumping slurries or muds - Groundwater management - Soil sampling accuracy for soil gradation testing by Collector Well Subcontractor - Reception shaft installation and removal The work does not include either construction of the caisson well, nor construction of the other eight (8) laterals, nor procuring and outfitting the wells with the permanent production equipment. Project work will be performed at the City's North Campus Well Field in Weld County near the intersection of Highway 85 and Weld County Road 8. The estimated value of this work is $2,000,000 All questions shall be submitted via email to Justin Montes, Project Manager, at jmontes@auroragov.org AND Nathan Jones, Contract Administrator, via email at njones@aurora.gov.org. Telephone inquiries will be accepted only for procedural questions by calling Nathan Jones at 303-739-7343. Questions are due by 2:00 p.m., local time, July 7, 2025. Responses will be posted via addendum posted to BidNet.
Post-Bid
Water / Sewer
$2,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2025
September 12, 2025
US-85 & Co Rd 8, Fort Lupton, CO
Related To This Project
Fort Lupton, CO
Bid Date: Aug 22 2025
Fort Lupton, CO
Bid Date: Aug 22 2025
Fort Lupton, CO
Bid Date: Sep 12 2025
Fort Lupton, CO
Bid Date: Sep 08 2025
Fort Lupton, CO
Bid Date: Sep 08 2025
Fort Lupton, CO
Bid Date: Sep 11 2025
Fort Lupton, CO
--
Fort Lupton, CO
Bid Date: Sep 23 2025
Fort Lupton, CO
Bid Date: Jun 16 2025
Fort Lupton, CO
Bid Date: May 23 2025
Fort Lupton, CO
Bid Date: Jun 06 2025
Fort Lupton, CO
Bid Date: May 23 2025
Fort Lupton, CO
Bid Date: Jul 16 2025
Fort Lupton, CO
Bid Date: May 19 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.