BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work for a sidewalk / parking lot in Kirksville, Missouri. Completed plans call for site work for a sidewalk / parking lot.

2024-2025 Parking Lot Camera Coverage The Kirksville R-III School District is seeking competitive bids for the installation and procurement of security cameras to provide coverage for the District's new parking lot. The project is divided into three zones (Zone A, Zone B, and Zone C), and vendors are required to submit separate bids for each individual zone, as well as a combined bid covering all three zones. Vendors will be responsible for providing all labor and materials, including but not limited to: cabling, mounting, powering of cameras, camera hardware, and any other related equipment necessary for a complete and functional system. Vendor Responsibilities: Provide and install all required cabling (plenum-rated where applicable) from camera locations to network closets. Mount and power all cameras in designated locations. Supply all camera materials, mounts, junction boxes, and any required accessories. Ensure all cameras are Hanwha brand and include a perpetual Wisenet license. Test and verify full functionality of all installed cameras and system components. Label all cabling clearly at both ends (camera side and switch side) indicating zone and camera location. Installation and full system testing must be completed by July 18, 2025. The District reserves the right to reject any or all bids. The Kirksville R-III School District is seeking competitive bids for the installation and procurement of security cameras to provide coverage for the District's new parking lot. The project is divided into three zones (Zone A, Zone B, and Zone C), and vendors are required to submit separate bids for each individual zone, as well as a combined bid covering all three zones. Vendors will be responsible for providing all labor and materials, including but not limited to: cabling, mounting, powering of cameras, camera hardware, and any other related equipment necessary for a complete and functional system Zone A is the Districts highest priority area due to expected high student foot traffic and will require primary attention during planning and execution. Vendor Responsibilities: Provide and install all required cabling (plenum-rated where applicable) from camera locations to network closets. Mount and power all cameras in designated locations. Supply all camera materials, mounts, junction boxes, and any required accessories. Ensure all cameras are Hanwha brand and include a perpetual Wisenet license. Test and verify full functionality of all installed cameras and system components. Label all cabling clearly at both ends (camera side and switch side) indicating zone and camera location. Contact Information: For questions or clarifications, please contact Matt Stief at: Email: mstief@kirksville.k12.mo.us Phone: 660-626-1410

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
22
Bidding Soon
335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

June 16, 2025

Project location map

Multiple Locations, Kirksville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.