Published September 10, 2025 at 8:00 PM

Updated September 11, 2025

Site work for a water / sewer project in Sumner, Georgia. Completed plans call for site work for a water / sewer project.

No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days.The Project consists of raising the Town's existing 50,000-gallon multi-leg elevated water storage tank to increase the high-water level by 30 feet. Bids shall be on a lump sum and unit price basis, with any alternate bid items if indicated in the Bid Form. Bidding Documents also may be examined at Town of Sumner's Town Hall, during the Town's regular business hours. The Issuing Office for the Bidding Documents is: Still Waters Engineering, 130 Veterinary Way, Unit 2, Leesburg, GA 31763. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 AM - 5:00 PM and may obtain copies of the Bidding Documents from the Issuing Office. Upon Issuing Office's receipt of payment, Bidding Documents will be sent via email or other means of electronic file distribution. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.Bids will not be accepted from prospective bidders not on record with the Issuing Office as having purchased and received a complete set of Bidding Documents. Bonds must be provided by sureties appearing on the U.S. Treasury Department's most current Circular 570 Listing and be licensed in the State of Georgia. All permits required for the construction of this project are expected to be approved prior to the date of the bid opening. Acquisition of property for permanent easements, right of way, etc. is not expected to be required for this project. The Town of Sumner is committed to Affirmatively Further Fair Housing. This project is funded in part by a Community Development Block Grant. The work to be performed under this contract is under a program providing direct Federal financial assistance from the Department of Housing and Urban Development and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968 as amended, 12 U.S.C. 1701 U. Section 3 requires that to the greatest extent feasible, opportunities for employment and training be given to the low-income residents of the project area, and contracts for work in connection with the project to be awarded to business concerns which are located in, or owned in substantial part by persons residing in the area of the project. Section 3 Residents and Business Concerns are encouraged to apply. Please contact City Clerk Lance Botdorf at 229-776-7384 for information on any employment, contracting and subcontracting opportunities. This agreement is for services related to the project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act ("IIJA"), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in the project must be produced in the United States, as further outlined by the Office of Management and Budget's Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18, 2022. The Town of Sumner is committed to providing all persons with equal access to its services, programs, activities, education, and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. This project is expected to be funded all or in part by the Town of Sumner and the Georgia Department of Community Affairs-U.S. HUD Community Development Block Grant program. The Town of Sumner reserves the right to reject all bids, including without limitation, the right to reject any or all nonconforming, nonresponsive, unbalanced or conditional bids, and to make an award in the best interest of the City of Sumner.

Award

Water / Sewer

$494,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
38
Bidding Soon
499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

July 9, 2025

Project location map

Multiple Locations, Sumner, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.