BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated December 2, 2025

Renovation of a multi-residential development in Fall River, Massachusetts. Completed plans call for the renovation of a multi-residential development.

Window replacement in the 2nd through 6th floor apartment spaces and the north and south stairwells. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work is estimated to cost approximately $2,400,000. The work generally includes, but is not limited to the following: 1. Removal and replacement of existing window assemblies in the 2 nd through 6 th floor apartment spaces and the north and south stairwells. The scope of work will also include the removal and replacement of all existing sill flashing and minor renovations of interior gypsum board wall assemblies to accommodate the new window installations. 2. Windows shall be removed and disposed of as asbestos-containing material. Refer to Section 01 11 31 Hazardous Materials Procedures, herein. 3. Furniture, wall hangings, area rugs, and other articles will be removed from the work area in apartments, by Owner, prior to the Contractor working in such apartment. 4. The Contractor shall be responsible for the removal and placement of existing air-conditioning units in each apartment. A/C units will not be reinstalled in new windows. 5. The Contractor shall be responsible for the removal and storage of existing window curtains and draperies within each apartment. The Contractor shall be responsible for reinstalling existing window curtains and draperies in the same location, within each apartment. 6. The Contractor shall be responsible for the removal and disposal of existing window shades within each apartment. The Contractor shall be responsible for providing new roller shades within each apartment. Mock-up installation: 1. To establish a level of consistency throughout the project, the Contractor shall complete the work (100%) in one apartment, as designated by the Owner, and the work shall be approved by the Owner and Architect prior to proceeding with the specified work in the remaining apartments. Question Deadline 05/13/2025 Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written. Oral requests must be confirmed in writing.

Bid Results

Multi-Residential

$2,599,000.00

Public - City

Renovation

13

16

5

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
523
Active Projects
250
Bidding Soon
3,874
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 16, 2025

Project location map

85 Morgan St, Fall River, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.