BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2025 at 8:00 PM

Updated May 14, 2025

Site work for a water / sewer project in Milbank, South Dakota. Completed plans call for site work for a water / sewer project.

2025 Water Meter Replacement Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. To Engineer Via Email: patc@bannerassociates.com Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. Project Scope will include the following but not limited to: o Furnish approximately 469, Neptune T10, 5/8 inch water meters o Furnish approximately 30, Neptune T10, 1 inch water meters o Furnish approximately 6, Neptune Mach 10, 1 1/2 inch water meters o Furnish approximately 4, Neptune Mach 10, 2 inch water meters o Installation of 509, water meters, miscellaneous appurtenances and materials for complete water meter replacement and installation Note to Bidders: The scope of this project is the replacement of water meters in select areas of the City of Milbank to bring those areas up to date with the City's existing system for Automated Meter Reading. The City's existing system utilizes meters, registers, and meter interface units (MIUs) manufactured by Neptune Technology Group. The city intends to maintain continuity in the metering and data collection of water service to users of the distribution system. Therefore, the City has determined Sole Source/Proprietary Product specification of equipment and materials to be supplied on the project is appropriate. Project Specifications and Bidding Documents reference only those products from Neptune Technology Group matching the existing metering and data collection system of the City of Milbank. Requests for approval of Substitute or Or-Equal products will not be considered. Bids may not be withdrawn after the time fixed for opening them. The Owner reserves the right to reject any and all bids, and to waive any irregularities therein.

Post-Bid

Water / Sewer

$250,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
18
Bidding Soon
267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

Multiple Locations, Milbank, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.