BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

Site work and paving for a mixed-use development in Schaumburg, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 29, 2025, at 1:00 PM at the Region One/District One Office in Schaumburg. Phase II engineering services are required for work related to contract plan preparation for road and bridge improvements, development of specifications and estimates, plan review, and surveying on various projects in District One. Work Orders may include the preparation of contract plans for various project involving roadway, bridge repairs and improvements, drainage improvement plans, preparation of miscellaneous roadway plans and structure details, lighting plans, traffic signal plans, ADA ramp details, review of plans by Consultant and local agency consultants for roadway and rehabilitations projects, obtaining pavement composition cores for resurfacing projects and geotechnical borings for structure design, and providing supplemental roadway and bridge deck surveying for various projects. The primary focus of the scope of work order will be contract plan preparation for roadway related projects. The estimated construction cost for this project is $300,000 to $6,000,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Roads and Streets) Structures (Highway: Typical) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 05 - RFQ Engineering - Various Phase II Projects, Various Routes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$6,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
511
Active Projects
290
Bidding Soon
3,712
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

Project location map

Multiple Locations, Schaumburg, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.