BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2025 at 8:00 PM

Updated May 4, 2025

Site work and paving for a mixed-use development in Rock Island, Illinois. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on August 5, 2025, at 10:00 AM at the Region Two/District Two Office in Dixon. Phase I engineering services are required for the preparation of a project report (anticipated to be a federal categorical exclusion) for the Avenue of Cities from 0.1 Mi. E. of 54th St. to Hospital Rd and at Kennedy Dr.; 19th St.: Ave of the Cities to 0.1 Mi. S. of 35th Ave in East Moline. This project is being studied because this portion of the Ave. of the Cities is considered a High Safety Tier Segment. Identifying ways to improve and mitigate crashes is the focus of this project. A safety study was performed and will be available to the Consultants team for review. The proposed improvements may include mainline reconstruction, including all side street intersections, adjacent frontage roads with horizontal alignment and vertical profile changes, plan and profile drawings, prepare IDS drawings, hydraulic analysis, multi-use path, identify utility conflicts, and drainage design. The project will also include a Traffic Management Analysis (TMA), crash analysis, environmental coordination, community impact evaluation, and cost estimates. It is anticipated that public involvement meetings may be necessary. In addition, coordination with multiple local agencies will be needed. The Prime firm must be prequalified in the Location Design Studies (Reconstruction/Major Rehabilitation) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 18 months after authorization to proceed The method of contractor selection has not been determined at this time. IL DOT - 33 - RFQ Engineering - 42nd Ave. in East Moline, Phase I Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$42,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
83
Bidding Soon
1,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2026

Project location map

42nd Ave, Rock Island, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.