This is a service / maintenance or supply contract in Peoria, Illinois. Contact the soliciting agency for additional information.

This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 23, 2025, at 1:30 PM at the Region Three/District Four Office in Peoria Phase I/II engineering services are required to provide work on various projects throughout District Four. Phase I work, if required, may consist of conducting route surveys, land surveys, hydraulic surveys, geometric analyses, environmental studies, Intersection Design Studies (IDSs), and Project Reports (categorical exclusion projects only). This work may include data collection, development of alignment alternatives, cost estimates, traffic management analyses, traffic management plans, crash analyses, geometric studies, traffic studies, drainage studies, safety studies, and all other related work required to produce the necessary Phase I documents and reports. Phase II work, if required, may consist of conducting route surveys, land surveys, roadway plans, drainage plans, geometric plans, traffic signal plans, lighting plans, traffic staging plans, temporary and permanent erosion control plans, plats and legal descriptions for Right-of-Way acquisition, and any other related work required to complete plans, specifications and estimates as necessary The Prime firm must be prequalified in the Special Services (Surveying) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 60 months after authorization to proceed. The method of contractor selection has not been determined at this time. IL DOT - 37 - RFQ - Various Phase I/II Projects, Various Routes, Various Counties, Region Three/District Four *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$2,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
77
Bidding Soon
1,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2025

Project location map

Multiple Locations, Peoria, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.