Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 3, 2025 at 8:00 PM
Updated May 4, 2025
This is a service / maintenance or supply contract in Peoria, Illinois. Contact the soliciting agency for additional information.
This project requires 26% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 23, 2025, at 10:00 AM at the Region Three/District Four Office in Peoria Phase III engineering services are required for construction inspection, supervision, construction layout, documentation of pay quantities and related forms for record keeping, Construction & Materials Management System (CMMS) documentation, on-site quality assurance material testing, and night-time inspection as needed. The Consultant will be responsible to ensure Contractors complete the work in accordance with the plans and specifications. The Consultant must provide sufficient staff to perform all engineering services required to complete the projects. The projects may consist of any projects on an IDOT Letting including, but not limited to patching and resurfacing, bridge repair, rehabilitation, and replacement, roadway widening and resurfacing, traffic signal/electric, vertical/horizontal realignment, and/or new roadway projects. The Consultant shall provide vehicles, cell phones, computers capable of running CMMS software and scanner, on-site testing equipment, tools of the trade, and all other equipment deemed necessary to complete the project in accordance with Departmental policies. The Prime firm must be prequalified in the Special Services (Surveying) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The completion date for this contract will be 60 months after authorization to proceed. The method of contractor selection has not been determined at this time. IL DOT - 39 - RFQ - Various Phase III Projects, Various Routes, Various Counties *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$2,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 24, 2025
Multiple Locations, Peoria, IL
Related To This Project
Peoria, IL
--
Peoria, IL
Bid Date: May 21 2025
Peoria, IL
Bid Date: Oct 05 2021
Peoria, IL
Bid Date: Oct 28 2021
Peoria, IL
Bid Date: Aug 26 2021
Peoria, IL
Bid Date: May 13 2025
Peoria, IL
--
Peoria, IL
Bid Date: Mar 19 2025
Peoria, IL
Bid Date: May 02 2025
Peoria, IL
Bid Date: May 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
