Published May 16, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and new construction of a mixed-use development in Minneapolis, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and playground / park / athletic field.

As of May 15, 2026, the project was awarded to Ebert Construction, with an awarded amount of $1,171,830.97. Bunker Beach Facility Improvements - Lazy River Bridge Question Deadline 04/10/2026 at 3:00 PM CT All questions must be submitted in writing to the authorized representative, All questions regarding the protest should be directed to: Lindsey Felgate, Purchasing Manager 763-324-1735 or Lindsey.Felqate@anokacountymn.gov 'The work to be performed under the provision of these contract documents shall include Bid Package A - Lazy River Bridge description: Removal of the existing Lazy River Bridge, associated ramps, foundations and adjacent pavements for installation of a new Lazy River Bridge. Project scope includes all associated civil site pavement, mechanical removals and installations, and landscaping features. Upgrades to the existing site elements are also included in the project scope. These upgrades include seat wall elements, concrete form liners on the approach ramp walls, concrete stairs, and pigmented concrete pavements at selected locations. AWARD DATE: NOTICE TO PROCEED: Bid Package B - Mechanical Building Upgrades description: Removal of existing sand filters within the Adventure Pool Mechanical Building and installation of new sand filters. Project scope includes all associated re-piping work, selective demolition of the existing structure for construction access, and associated electrical modifications. Upgrades to the existing mechanical pit are also included in the project scope. A new hoist system for lifting filter and pump equipment, a new steel catwalk and modifications to the existing guardrails around the pit. the furnishing of all materials, labor, tools, and equipment necessary to successfully and safely complete the construction of improvements as described in the Plans and Specifications herein. Minor appurtenances not specifically listed as proposal items, but which are necessary to complete the project, as shown in the Plans and Specifications, in a satisfactory manner, shall be considered incidental items and no direct compensation will be made therefore. The CONTRACTOR is responsible for safety and security on this project. RESPONSES ISSUED:Wednesday, April 15, 2026, by 3:00 P.M. Custom Bid Result. Package A: Ebert Companies $825,778.45 Package B: Ebert Companies $367,352.52

Award

Bridges / Tunnels

$1,171,831.00

Public - County

Demolition, New Construction, Site Work

34

33

42

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
167
Bidding Soon
2,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

September 8, 2026

Project location map

701 County Rd A, Minneapolis, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.