Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 19, 2025 at 8:00 PM
Updated May 20, 2025
Renovation of a fire / police facility in Redlands, California. Completed plans call for the renovation of a 1,253-square-foot fire / police facility.
Labor and materials to install approximately 1253 square feet of WeatherWeld Roofing System R-1P-16-45-A Question Deadline 05/13/2025 at 2:00 PM PT Online Q&A Yes Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Response Types Line Items Type of Award Lump Sum License Requirements A, B or C-39 Liquidated Damages 500.00 Per Day Project Duration 30 Calendar Days Estimated Quantities The quantities furnished under this Bid are to be considered as approximate only and are to be used solely for the comparison of Bids received. The City does not expressly or by implication represent that the actual quantities involved will correspond exactly therewith; nor shall the Bidder plead misunderstanding or deception because of such estimate in accordance with the Specifications. Quantities may be increased or diminished. Price/cost All Charges Should Be Included on the Price Sheet Which Includes All Associated Costs (Including but Not Limited to Delivery, Freight, Etc.) Bidder Must Bid on All Items. Award Will Be Made to the Lowest Responsive and Responsible Bidder. Line Item Bid: the City is Seeking Individual Bids for Each Item. Each Line Item Will Be Considered for Award Separately to the Lowest Responsive and Responsible Bidder. Bidders May Bid on One, Any, or All of the Items. Bidders Shall Complete All Category Fields to Be Deemed a Responsive Bidder for Such Category. The City May Elect to Award Only One, Any, or All Items. Prevailing Wages When Applicable, the City is Subject to the State of California Prevailing Wage Laws as Set Forth in California Labor Code Section 1770 Et Seq. The Contractor is Responsible for Determining the Appropriate Department of Industrial Relations (Dir) Classification for the Various Employees and Subcontractors Used for a Particular Project or Service. No Contractor or Subcontractor May Work on a Public Works Project Unless Registered With Dir. No Contractor or Subcontractor May Be Awarded a Contract for Public Work on a Public Works Project Unless Registered With the Department of Industrial Relations Pursuant to Labor Code Section 1725.5 Terms and Conditions by Submitting a Bid, Vendors Acknowledge Conformity With All of the Bid Notices and Attached and Written Terms and Conditions Such as, but Not Limited to, Insurance, Business License, Applicable Labor Codes and Laws.
Post-Bid
Fire / Police
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
14
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 19, 2025
June 18, 2025
1270 W Park Ave, Redlands, CA
Related To This Project
Redlands, CA
Bid Date: May 20 2025
Redlands, CA
Bid Date: May 21 2025
Redlands, CA
Bid Date: Jun 02 2025
Redlands, CA
Bid Date: Jun 10 2025
Redlands, CA
Bid Date: Jun 16 2025
Redlands, CA
Bid Date: Jun 18 2025
Redlands, CA
Bid Date: Jun 23 2025
Redlands, CA
Bid Date: Jun 18 2025
Redlands, CA
Bid Date: May 21 2025
Redlands, CA
Bid Date: May 05 2025
Redlands, CA
Bid Date: May 08 2025
Redlands, CA
Bid Date: May 08 2025
Redlands, CA
Bid Date: May 06 2025
Redlands, CA
Bid Date: May 05 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
