Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 21, 2025
Site work for a water / sewer project in Rutland, Vermont. Completed plans call for site work for a water / sewer project.
A brief description of similar projects completed by the bidder A brief list of projects completed in Rutland County; Project Budget: A budget should include staff time and expenses calculated with as much transparency as possible. Please include as much information as necessary to show itemized costs and include budget narratives, if needed. Please include names and billable rates for staff listed in the budget, as well as hourly rates and estimated number of hours for equipment to be used in the project; please include materials costs, as applicable. The South Lake CWSP is interested in hiring a contractor to complete construction of an underground stormwater infiltration system located in the Town Park of Fair Haven, Vermont. The project includes installation of an underground treatment tank system that will treat 17,000 CF of water (of 36,400 of generated WQv). Fitzgerald Environmental Associates created the final stormwater design for this project (11/25/2024). This project consists of an urban drainage area of 25.97 acres, including 9.73 acres of impervious surfaces (largely paved roads, driveways and rooftops) that currently drains to the Poultney River via the Castleton River. The project includes three main activities: boring under Park Street (or otherwise running new pipe) from an existing storm drain at Park Street and Caernarvon Street to the town Park; installing a swirl separator/pretreatment unit; and excavating for, backfilling with washed stone, and installing an assemblage of R-Tanks in the park. The South Lake CWSP is interested in hiring a contractor to complete construction of an underground stormwater infiltration system located in the Town Park of Fair Haven, Vermont. The project includes installation of an underground treatment tank system that will treat 17,000 CF of water (of 36,400 of generated WQv). Fitzgerald Environmental Associates created the final stormwater design for this project (11/25/2024). This project consists of an urban drainage area of 25.97 acres, including 9.73 acres of impervious surfaces (largely paved roads, driveways and rooftops) that currently drains to the Poultney River via the Castleton River. The project includes three main activities: boring under Park Street (or otherwise running new pipe) from an existing storm drain at Park Street and Caernarvon Street to the town Park; installing a swirl separator/pretreatment unit; and excavating for, backfilling with washed stone, and installing an assemblage of R-Tanks in the park.
Post-Bid
Water / Sewer
$161,750.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
