BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of a multi-residential development in Gander, Newfoundland. Completed plans call for the renovation of a multi-residential development.

Closing Time: 1:00 PM (NT) Question Deadline 05/15/2025 at 12:00 AM NT Questions are submitted online Yes SHINGLE REPLACEMENT (ENTIRE BUILDING) 1. Remove the following materials; shingles, all underlayment and eave protection materials, drip edges, flanges and flashings. All materials are to be removed from site and disposed of at an Approved Waste Disposal Site. NOTE: Asbestos Abatement Procedures must be followed for all USM removal due to positive test results in the roofing cement. Contractor's submitted price must include all permits, inspections, removal, disposal and any other incurred cost. 2. Remove any affected sections of eavestrough, downspouts and metal fascia where any rot is found and store for later re-installation. Remove all rotted or deteriorated wood fascia boards and roof sheathing and replace with new materials to match existing. Re-install metal fascia, eavestrough and related components after all repairs have been completed. Inspect the entire attic space and replace any wet or deteriorated insulation with new to match. Unit prices for these items must be entered on the attached TF-8, Schedule "F" document. 3. Re-nail existing roof deck, using galvanized nails to penetrate framing by 50mm. 4. Apply Two (2) rows of overlapped eave protection underlayment parallel to eaves and Nova Seal or approved equal as recommended by shingle manufacturer to the remainder of the roof surface. 5. Remove all vinyl siding and related components on the rear dormer at all roof-wall intersections and both chimneys as needed and install new metal step flashings to replace the existing. Refer to Detail #7-102: Roof Wall Intersection with Step Flashing Detail. Re-install the existing vinyl siding and related components back to the original locations. 6. Install new, 30 Year, two tone black, single tab shingles to the entire roof surface. Install shingles using high wind application as per manufacturer's instructions. Install using six nails per shingle complete with new aluminum drip edge around entire perimeter of the building. 7. Replace all existing roof vents, flanges, collars, drip edges and flashings with new to match. 8. Install an additional Four (4) new roof vents on the rear elevation of roof (2 per side/residence). New vents should be installed as per attached Master Specifications Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Multi-Residential

$75,600.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

20

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
6
Bidding Soon
81
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

June 23, 2025

Project location map

101-103 Sullivan Avenue, Gander, NL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.