Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work for a water / sewer project in Westborough, Massachusetts. Completed plans call for site work for a water / sewer project.

The suc-cessful bidder must complete the construction project within 90 days of the Town achieving the maintenance drawdown in the impoundment. The work on the Lower Sandra Pond Dam Spillway Modification project consists of vegetation removal, removal and resetting of riprap, raising the spillway channel walls and installation of a new spillway headwall with cast-in-place concrete, underpinning of a concrete wall, regrading of por-tions of the dam, and miscellaneous control of water and erosion/sediment control installation. The bidding and Award of this Contract will be under the provisions of M.G.L. c. 30 39M. The Town of Westborough reserves the right to accept any bid, in whole or in part, to reject any/or all bids and to waive minor irregularities and/or informalities as it deems to be in the best interest of the Town. A Bid deposit in the amount of 5% of Total Bid is required in the form of Check or Bid bond. 100% Payment and Performance Bonds will also be required for the resulting contract. Prevailing Wages do apply to this contract. The Town is an Equal Opportunity Employer and encourages MBE/WBE/DBE participation in response to the bid process.

Bid Results

Water / Sewer

$234,750.00

Public - City

Site Work

15

15

7

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
913
Active Projects
401
Bidding Soon
6,122
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2025

July 21, 2025

Project location map

71 Upton Rd, Westborough, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed