Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2025 at 8:00 PM
Updated June 25, 2025
Renovation of a water / sewer project in Altoona, Pennsylvania. Completed plans call for the renovation of a water / sewer project.
This project will not be going out for bid until 5/16/2025 Electrical Work The project includes replacement of the existing influent screens at the Easterly and Westerly Combined Sewer Overflow Facilities and associated electrical/telemetry upgrades. The project will be financed by the Pennsylvania Infrastructure Investment Authority. Bidders are directed to the Super Cross Cutter requirements of the Bid Documents for construction projects funded under the PennVEST Clean Water and Drinking Water State Revolving Fund loan programs. Notice is given that not less than the minimum wage rates set forth in the Contract Documents must be paid to employees on this project in accordance with the U.S. Department of Labor, Davis-Bacon General Wage Decision. The Contractor is subject to the provisions of the Federal Consolidated Appropriations Act, January 17, 2014, P.L. 113, No. 76,436, American Iron and Steel Act to furnish iron and steel as defined in the Act and amendments. Each bid must be accompanied by a Bank Check, Certified Check; or Bid Bond naming as payee or obligee, the Altoona Water Authority, in the amount of five percent (5%) of the total amount of the bid as security for proper execution of the Agreement and the submission other documents as required by the Bidding Documents. The Successful Bidder will be required to execute the Agreement and to furnish performance and payment bonds, each of said bonds to be in the amount of one hundred percent (100%) of the Contract Price, all in the respective forms provided in the Bidding Documents. The Contractor also will be required to furnish evidence of insurance coverage as required by the Bidding Documents. All bonds shall be executed by sureties named in "Circular 570 - Companies Holding Certificates of Authority as Acceptable Sureties in Federal Bonds and as Acceptable Reinsuring Companies" (current publication) by the Audit Staff, Bureau of Government Financial Operations, U.S. Treasury Department. The Altoona Water Authority reserves the right to reject any or all bids or parts thereof or items therein to. GD&F/2400500 11 16-1 Easterly/Westerly CSO Facilities Screen Replacement Project Altoona Water Authority waive any defects or irregularities in the Bids, and to accept any Bid which, in its judgment, is in its best interest. Bids shall remain open for a period of sixty (60) days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of one hundred twenty (120) days from the date of Bid opening. No bids may be withdrawn, except when the Bidder complies with the withdrawal requirements of Act No. 4 of the General Assembly of Pennsylvania, Senate Bill 793, Printers No. 1655, as amended Authority. Question Deadline 06/10/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$299,500.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2025
August 18, 2025
Multiple Locations, Altoona, PA
Related To This Project
Altoona, PA
Bid Date: May 27 2025
Altoona, PA
Bid Date: Jun 05 2025
Altoona, PA
Bid Date: Jun 17 2025
Altoona, PA
Bid Date: Jun 03 2025
Altoona, PA
Bid Date: Aug 11 2025
Altoona, PA
Bid Date: Jul 03 2025
Altoona, PA
Bid Date: Aug 20 2025
Altoona, PA
Bid Date: Aug 05 2025
Altoona, PA
Bid Date: May 28 2025
Altoona, PA
Bid Date: May 06 2025
Altoona, PA
--
Altoona, PA
Bid Date: May 02 2025
Altoona, PA
Bid Date: Apr 30 2025
Altoona, PA
Bid Date: May 08 2025
Altoona, PA
Bid Date: Apr 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
