Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
This is a service / maintenance or supply contract in Honolulu, Hawaii. Contact the soliciting agency for additional information.
The purpose of this solicitation is to provide Tree Trimming services at Honolulu Control Facility (HCF). The Contractor must furnish all necessary materials, equipment, and services to perform work under this contract. The Contractor must obtain written approval from the COR or CO for any contractor-owned equipment kept on FAA property. TREE TRIMMING SERVICE REQUIREMENTS Trees Involved: Coconut Trees: 22 Shower Trees: 6 Mango Trees: 4 Monkey Pod Trees: 4 Kiawe Trees: 4 Banyan Trees: 45 Specific Tasks: Coconut/Kamani nut Trees: Prune and trim all Coconut trees where the trunks are under 6 feet tall annually. Remove loose, dying, and wilted fronds, along with all coconuts. Cut and remove coconut trees over 6 feet tall, including stump grinding and landscape restoration. Cut and remove all Kamani nut trees, including stump grinding and landscape restoration. Trees: Prune and trim along the entrance and sides of the roadway and adjacent parking lot. Maintain an 8-foot vertical clearance from the ground Perform canopy cleanout by removing dead or dying branches. Remove branches within 10 feet from any structure such as rooflines, stairs, or tower Other plants Remove dead or dying material. Debris Removal: Remove all dead branches and debris from trees near roadways, walkways, and solar arrays, disposing of it off-site. Security Camera Clearance: Trim trees near security cameras for unobstructed views. Solar Panel Clearance: Remove branches within 10 feet of solar panels. WASTE DISPOSAL AND CLEAN-UP REQUIREMENTS Waste Disposal: The contractor must maintain a clean work environment and remove all materials requiring disposal during construction. FAA dumpsters cannot be used; all waste must be recycled or disposed of according to State and Federal regulations. Other Considerations: Compliance with OSHA safety requirements is mandatory. Work performed without FAA oversight may be subject to inspection at the contractor's expense. Unauthorized work will not be accepted or compensated. The contractor must protect existing facilities, equipment, buildings, and vegetation. Damages caused must be repaired at no additional cost. The contractor is responsible for all necessary temporary protections during this time. Security Requirements: Employees must complete security forms for background checks, and a list of employees must be submitted within ten days of contract award. Compliance with additional badging requirements may be necessary. Solicitation requirements may change prior to posting date and other relevant documents may be added for clarity. Period of Performance: Total Period of Performance will be for a base plus 4 option year contract The Method of Contractor Selection has not been determined at this Time.
Conceptual
Military
Public - Federal
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 26, 2025
760 Worchester Ave, Honolulu, HI
Related To This Project
Honolulu, HI
Bid Date: Jun 03 2025
Honolulu, HI
Bid Date: Jun 03 2025
Honolulu, HI
Bid Date: May 30 2025
Honolulu, HI
Bid Date: May 29 2025
Honolulu, HI
Bid Date: Jun 20 2025
Honolulu, HI
Bid Date: May 30 2025
Honolulu, HI
Bid Date: Jun 04 2025
Honolulu, HI
--
Honolulu, HI
Bid Date: May 15 2025
Honolulu, HI
Bid Date: May 27 2025
Installation of Starlink Satellite Internet Systems at Various Parks and Stadium Locations - 5779281
Honolulu, HI
Bid Date: May 29 2025
Honolulu, HI
Bid Date: Jun 05 2025
Honolulu, HI
Bid Date: May 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
