BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

This is a service / maintenance or supply contract in Elk Grove, California. Contact the soliciting agency for additional information.

Question Due Date: May 15, 2025 5:00 p.m. All communication regarding this RFP should be directed to Catherine Armstrong via email SCOPE OF SERVICES This section describes the nature and scope of engineering services needed for the completion of West Sacramento Dual Force Main Cathodic Protection Installation Project. The scope of services will include, but not be limited to, those stated below. A submitted proposal must address the entire scope of services listed. Additional tasks of modifications to the scope of services that the consultant thinks will produce a more costeffective project should be included in the proposal. The consultant must clearly define the anticipated deliverables for all additional tasks or modifications to the scope of services for this project. Upon commencement of contract negotiations with the highest-ranked consultant, SacSewer and the consultant must mutually agree in advance of executing the contract on the types of deliverables to be prepared and the level of detail to be provided. Page 7 of 16 SacSewer has prepared a list of tasks necessary for completing this project, which must be used as a basis for the preparation of this proposal. SacSewer will provide any existing plans, details, sections, pictures, reports, or schematics to the selected consultant. The selected consultant will provide the following: a) Project kickoff meeting b) Pre-design current testing c) Design, plans, and specifications for the cathodic protection system d) Bi-weekly design review meetings e) Engineer's cost estimate f) Permit application(s) g) Bid Support - plan for two addenda h) Engineering services during construction i) Operations and maintenance plan j) Post-construction testing The design, plans, and specifications will include, but not be limited to, all components necessary for the site preparation, selection, installation, testing, and project sequencing of the cathodic protection system, and other items mentioned in Sections 4 and 8. Anticipated deliverables of the selected consultant: o 60, 90, and 100% design plans and specifications for Bid Package o Testing reports o Engineer's Estimate o Permit Application(s) o Operations and maintenance plan

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
214
Bidding Soon
2,995
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2026

Project location map

Multiple Locations, Elk Grove, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.