BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

Renovation of a mixed-use development in Grand Rapids, Michigan. Completed plans call for the renovation of a educational facility.

Kent Intermediate School District (Kent ISD) is seeking bids for the replacement of a boiler and circulating pumps at KEC-Oakleigh, 2223 Gordon St NW, Grand Rapids, MI 49504. Questions regarding the specifics of the bid should be directed via email through online, and answers will be provided through the same means. Any other information deemed critical to the RFP shall be sent out to all bidders. This specification communicates minimum requirements for BAS contractors to follow. It is a work in progress and the Kent ISD Facilities Department should be contacted directly at 616-365-2290 or facilities@kentisd.org with any questions. It is the intention to formally award the bid once the Kent ISD Board approves the recommendation of award at the June 16, 2025, Board Meeting, with installation occurring after July 1, 2025. SCOPE Mechanical: All components of the new boiler installation (materials, layout, orientation, positioning) are to match the boiler that is installed o Disconnect and remove the existing boiler, haul away, and dispose o Install a new boiler onto the existing pad o Install new boiler pump. To be Grundfos MAGNA3 50-150 F 280, no alternates accepted. o Install required boiler piping to the new boiler and reinsulate as required o Install gas piping to the new boiler o Install condensate lines and neutralizers o Remove existing boiler stacks and install new venting material o Any rigging to be included o Perform start-up and check-out o Include a one-year warranty, minimum o Boiler to be Lochinvar Knight XL Model No. KBX1000N. No alternates accepted. Hot Water System Circulating Pumps o Disconnect and remove existing pumps, haul away, and dispose of o Furnish and install (2) new B & G base mounted pumps series 1510-e, 110 GPM@50 ft. o Furnish and install new suction diffusers o Furnish and install new triple-duty valves o Furnish and install new SS flexible pump connectors o Furnish and install new Bobco differential pressure gauge kits o Furnish and install required piping to fit new pumps o Insulation of new piping to be included o Testing and balancing to be included - Owner to Provide Specs o Perform start-up and check-out o Include a one-year warranty, minimum

Award

Educational

$75,220.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
159
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

July 1, 2025

Project location map

2223 Gordon St NW, Grand Rapids, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.