BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Demolition and site work for a water / sewer project in Seabrook, Texas. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Demolition and haul off of Crane 212 at Bayport Container Terminal. A bid bond of 5% must be submitted. The Response and all required documents shall remain valid for a period of one hundred twenty (120) calendar days after the Response Due Date. The Port Authority reserves the right to reject any or all Responses. Question Deadline 06/04/2025 All technical questions and requests for clarification pertaining to the Proposal Documents shall be submitted using the Port Authority's BuySpeed eProcurement System

Award

Water / Sewer

$918,895.00

Public - City

Demolition, Site Work

7

12

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
170
Bidding Soon
3,488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 11, 2025

Project location map

12619 Port Rd, Seabrook, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.