BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 9, 2026 at 8:00 PM

Updated July 11, 2026

Site work for a water / sewer project in Sept-Îles, Quebec. Conceptual plans call for site work for a water / sewer project.

Reference number: 20158277 Deadline for receipt of complaints 2026-07-23 There is provision for a tendering process for each tender No Electronic tender submission accepted No Expected duration of the contract without options (in months) 12 Description 1.1 PURPOSE OF THE TENDER The City of Sept-Iles requires professional services for the preparation of plans and specifications, as well as residential supervision of the repair work on part of the wastewater backwater network to aerated B1 ponds. 1.2 LOCATION OF THE WORK COVERED BY THE MANDATE The proposed works are located on the wastewater backflow network, between the SP-3 (801 Arnaud Avenue), SP-10 (intersection of Pere-Divet Street with De Quen Avenue) and the B1 aerated ponds (250 Laure Boulevard Est) pumping stations. 1.8 PROFESSIONAL EXPERTISE Only bidders with expertise in engineering and more specifically in the design of wastewater discharge systems are eligible to submit an offer, all in accordance with the provisions of the specific and technical clauses of the call for tenders and the applicable regulatory requirements. The engineering firm is responsible for forming a multidisciplinary team, that is to say, to select and hire the required firms in the different specialties as well as any other service provider required for the fulfillment of the mandate. The bidder must provide, at the request of the City, all necessary documents to demonstrate the qualification and experience of the personnel assigned to the mandate. Bids submitted by a consortium are not accepted by the City. 4.7 TIMELINE FOR THE ASSIGNMENT The assignment must be completed - that is, the final deliverables must have been accepted by the City - by the following deadlines at the latest: Activity Deadline Concept validation report 3 weeks Preliminary plans and specifications 4 weeks Final plans and specifications for tender 3 weeks Final plans and specifications for construction 2 weeks* * Once authorisation has been received from the City to proceed with this activity

Conceptual

Water / Sewer

$1,000,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
1
Bidding Soon
59
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2026

Project location map

Multiple Locations, Sept-Îles, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.